Laserfiche WebLink
Numberof <br />Type of Sampling <br />Item and Descrlption <br />Frequency <br />samples per <br />Cost per site/item <br />Sub -totals <br />event <br />Gore modules at 2 COSM wells and 1 <br />USFW well, One of the quarterly sample <br />event will occur during a rain and Include <br />Routine/baseline <br />Cottonwood Creek, If a significant rain <br />3 <br />3 <br />$310.00 <br />$2,790.00 <br />Quarterly Sampling <br />event does not occur then the quarterly <br />sampling will be carried out as the <br />1 <br />4 <br />$310,00 <br />$1,240,00 <br />previous sample events, <br />3 <br />3 <br />$300,00 <br />$2,700,00 <br />Routine/baseline <br />Basic water chemistry and quality analysis <br />Quarterly Sampling <br />at total of 2 COSM wells and 1 USFW wells. <br />1 <br />4 <br />$300.00 <br />$1,200,00 <br />Plus one quarter will include Cottonwood <br />Creek surface water during a significant <br />rain event, <br />1 <br />4 <br />$1,975,00 <br />$7,900,00 <br />Routine/baseline <br />Full suite of herbicide, pesticide, and <br />Quarterly Sampling <br />Pharmaceutical -Personal Care Products <br />(PPCP) analytes at total of 2 COSM wells,1 <br />USFWS well and Cottonwood Creek (SAT <br />lab-Herb/Pest, ALS lab -PCP) <br />Routine/baseline <br />Gore module setup fee for additional <br />4 <br />$100 ,00 <br />$400,00 <br />Quarterly Sampling <br />parameter per sampling event <br />staffsalary <br />Staff salaryfor4weekstime(salary+fringe <br />perweek) <br />4 <br />$1,522,99 <br />$6,091,96 <br />G RAN 0 IOTA L $22,321.96 <br />