City Council Meeting Minutes August 1, 2019 <br />-Downtown Alley Reconstruction <br />• Design funding <br />• Kissing Alley to University <br />-Downtown Pedestrian and Safety Improvements <br />• Smaller scale projects <br />• Improve sidewalks and aesthetics <br />• Benches, bike racks, lighting <br />• Downtown Pattern Book guidelines <br />• Involvement with Main Street & Downtown Association <br />The potential bond projects for 2020 include: <br />•Funding for Design <br />• Ensures good project scope/costs for bond election <br />• Shovel ready projects for bond construction <br />-Potential Bond Projects with 2020 design funds: <br />• Hopkins Street — Moore to Guadalupe <br />• Old Ranch Road 12 Bike and Pedestrian Project (electric) <br />• Purgatory Creek Bridge and Trail Improvements <br />-Additional projects have 2021 funding for design <br />The following 2020 General Fund Projects were Revised: <br />• #745 — 40 acres Master Plan deleted <br />• #547 — Ed JL Green Improvements delayed 3yrs. <br />• #438 — City Park ADA funding accelerated <br />• #739 — Dunbar Bldg. Rehab phased with design in 2020 <br />• #336 — Gary Softball Complex phased. Add 'I Phase 1 funding in 2020 <br />• #740 — River Parks Restroom delayed 1 yr. <br />•#616 — Cemetery Land Acquisition revised to actual <br />• #62 — Replace Smeal Pumper delayed 1 yr. <br />General Fund Beyond 2020: <br />-Complete 2017 bond projects <br />-Continue work on development of potential 2022 Bond Election projects <br />• Establish Bond Committee - Summer 2021 <br />• Bond Election — May 2022 <br />• Issue bond debt — Spring 2023 <br />-Continue seeking alternative funding through: <br />• Grants <br />• TxDOT <br />• TWDB <br />City of San Marcos Page 7 <br />