My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2019-025/adopting a budget in the amount of $239,058,970 for the fiscal year beginning October 1, 2019 and ending September 30, 2020
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2019
>
Ord 2019-025/adopting a budget in the amount of $239,058,970 for the fiscal year beginning October 1, 2019 and ending September 30, 2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:47:14 PM
Creation date
9/25/2019 3:39:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Budget
Number
2019-25
Date
9/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Community Aopment <br />Schedule of Permit Fees and Misc. Fees <br />DescriptionGroup <br />Weekend & After Hours Public Improvement Inspection <br />IFY 19 <br />1 $103.001 <br />FY 20 <br />$106.00per hr, 4 hr minimum <br />Site Preparation <br />Site Preparation (requires engineer) (does not include WPP review) <br />$1,751.00 <br />$1,796.00 plus $50.00 acre <br />Small Site Preparation <br />$309.00 <br />$317.00 <br />Permit to install on-site sewage disposal system <br />$183.00 <br />REMOVE FEE <br />Traffic Impact Analysis (TIA) <br />$773.00 <br />$793.00 <br />TIA(Worksheet) <br />$115.00 <br />$118.00 <br />CLOMR <br />$2,575.00 <br />$2,641.00 <br />LOMR (with approved CLOMR) <br />$1,545.00 <br />$1,585.00 <br />LOMA <br />$515.00 <br />$529.00 <br />Driveway/Sidewalk Permit <br />Residential (Type[) Driveway <br />$30.001 <br />$31.00 <br />Commercial (Type II) Driveway <br />$58.00 <br />$60.00 <br />ROW Maintenance/ Improvement Permit <br />15% of project value ($52 min/$2,250 <br />S%of project value ($52 min/$2,250 max) <br />Other Permit Fees <br />My Permit Now Technology Fee (applied to all permits) <br />$12.00 <br />$13.00 <br />On -premise signs <br />$2.50 per square ft ($50 min) <br />$2.50 per square ft ($50 min) <br />Off -premise signs/ billboards <br />$288.00 <br />$296.00 <br />Common Signage Plan <br />$288.00 <br />$296.00 <br />Fence permit Fee <br />$58.00 <br />$60.00 <br />Resubmittal Fee for 3rd Submittal (All Permit Types) <br />$288.00 <br />DUPLICATE/REMOVE <br />Reinspection Fee (2nd and subsequent inspections) Residential <br />$57.00 <br />REMOVE FEE <br />Reinspection Fee (2nd and subsequent inspections) Commercial <br />$258.00 <br />REMOVE FEE <br />Reinspection Fee (2nd and subsequent inspections) Multi -Family <br />$309.00 <br />REMOVE FEE <br />Reinspection Fee (2nd and subsequent inspections) Additional fee after 2nd Reinspection <br />$103.00 <br />REMOVE FEE <br />Fee -in -lieu <br />Sidewalk <br />$7.00 <br />$8.00 per square ft <br />Protected Trees <br />$158.00 <br />$163.00 per caliper inch <br />Heritage Trees <br />$314.00 <br />$323.00 per caliper inch <br />Code SMTX: Water Quality <br />$15,068.00 <br />$15,453.00 per acre ($0.34 / square foot) <br />Code SMTX: Detention (up to 7,000 sq. ft. impervious cover) <br />$8.00 <br />$9.00 square foot <br />Code SMTX: Detention (7,001- 28,000 sq. ft. impervious cover) <br />$5.00 <br />$6.00 square foot <br />Code SMTX: Detention (28,001 - 68,000 sq. ft. impervious cover) <br />$3.00 <br />$4.00 square foot <br />Code SMTX: Detention (68,001 - 100,000 sq. ft. impervious cover) <br />$2.00 <br />$3.00 square foot <br />Code SMTX: Detention (over 100,001 sq. ft. impervious cover) <br />$1.00 <br />$2.00 square foot <br />Code SMTX: Parking Fee -in -Lieu (reduction from 1.05 to 0.75 / bedroom) <br />$5,150.00 <br />$5,282.00 parking space <br />Code SMTX: Parking Fee -in -Lieu (reduction from 0.75 to 0.50 / bedroom) <br />$10,300.00 <br />$10,563.00 parking space <br />Code SMTX: Parkland Development Fee <br />$412.00 <br />$423.00 unit <br />Code SMTX: Parkland <br />$386.00 <br />$396.00 single family unit <br />Code SMTX: Parkland <br />$309.001 <br />$317.00 Imultifamily unit <br />ROW Use Fees <br />Short Term ROW Closure Neighborhood/Non-Profit (24 Hrs or Less) <br />$26.00 <br />$27.00 application fee <br />ShortTerm ROW Closure Commercial (24 Hrs or Less) <br />$52.00 <br />$54.00 application fee <br />Long Term ROW Closure Commercial <br />$103.00 <br />$106.00 application fee + $100/week (per lane per block) <br />Newsrack Application Fee <br />$50.00 <br />$52.00 per location, per publication <br />Newsrack Renewal Fee (Every 3 years) <br />$50.00 <br />$52.00 per location, per publication <br />Small Cell Application Fee <br />$500.00 <br />$513.00 per 5 network nodes, $250 each addiitional network node <br />Small Cell Pole Application Fee <br />$1,000.00 <br />$1,026.00 per pole <br />Floodplain Fees <br />Floodplain Application Fee: Single Family <br />$30ZOI <br />$31.00 <br />Floodplain Application Fee: Commercial <br />$173.00 <br />$178.00 <br />Single Family Infill -City Flood Analysis Fee <br />$1,030.001 <br />$1,057.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.