My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2019-025/adopting a budget in the amount of $239,058,970 for the fiscal year beginning October 1, 2019 and ending September 30, 2020
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2019
>
Ord 2019-025/adopting a budget in the amount of $239,058,970 for the fiscal year beginning October 1, 2019 and ending September 30, 2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:47:14 PM
Creation date
9/25/2019 3:39:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Budget
Number
2019-25
Date
9/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Department <br />Schedule of Permit Fees and Misc. Fees <br />1 <br />Two -Way Comma nication.5 tem <br />New Install & modifications Ill, page: $150 each additional page $100 <br />list page: $155 each additional page $103 <br />UndergrGundfire Service Systems <br />New Install & modifications 1°° page: $150, each additional page $100 <br />1st page: $155, each additional page $103 <br />others <br />All other Construction or Operational permits not specifically listed above <br />No Fee, 11, page: $150, each additional page $100, or Actual <br />No Fee, 1st page: $155, each additional page $103, or Actual <br />(See IFC 105.6 and 105.7) <br />cost of 3rd party plan review, as determination by Fire Code <br />cost of 3rd party plan review, as determination by Fire Code <br />Official <br />Official <br />Ins eciions <br />Outside of Normal Business Hours <br />$75.00 per hour min of 2 hrs. <br />$78.00 per hour min of 2 hrs. <br />Re -inspection fee <br />$50 <br />$52 <br />The re -inspection fee would be assessed after 2 failed inspection to which a <br />nPrmit was issued, <br />Eire Watch <br />1. Per Fire Service Personnel $75.00er hour min of 4 hrs. <br />$78.00 per hour min of 4 hrs. <br />2. Per Fire Apparatus $500.00 per hour (min of 4 hours)—Plus min. 3 personnel <br />$515.00 per hour (min of 4 hours)—Plus min. 3 personnel <br />Licensing Inspections <br />Home Child & Adult Day Care, MHMR Homes, & Group Homes less $75 <br />$78 <br />than 7 persons <br />Large Child & Adult Day Care Centers 100 <br />$103 <br />Hospitals, Nursing Homes, Assisted Living $2 per bed $200 minimum <br />$15 minimum <br />Mobile Food Vendors $50 annual) <br />$52 annual) <br />Foster Homes and adoption Inspections I No Fee <br />I No Fee <br />Upon adoption of this fee schedule the San Marcos Fire Department will be utilizing 3`d party plan review services to <br />supplement our plan review process. <br />The following plans will require plan review by 31party prior to submittal for permit: <br />M Fire Sprinkler Plans - new systems and system modifications (not otherwise exempt—see below) <br />M Fire Alarms Plans - new systems and system modifications ( not otherwise exempt—see below) <br />D Fire Sprinkler Monitoring Systems - new systems and system modifications (not otherwise exempt —see below) <br />D Special Hazard Fire systems — new and modifications <br />15 Operational permits for Aerosol Products, High -Rack / Piled Storage, and Hazardous Materials <br />The following plans do not require a 3" party review: <br />M Underground Fire Sprinkler Lines <br />Kitchen Hood Suppression systems <br />M Access/Egress Control Systems <br />M Operational permits for Fireworks <br />0 Tanks <br />Steps for Plans Requiring 3rd Party Review: <br />Step 1: Submit your plans to selected 3" party firm for our approved firm list. If you would like to utilize an alternative firm, <br />Step 2: Follow all processes for permit applications through the COSM Permitting Office. The plans reviewed by the 3r° party shall <br />Step 3: All plans must be submitted per the requirements of the Permitting Center and as an electronic copy (PDF) copy of <br />The 311 party plan review process will be completed in accordance with submittal requirements of the COSM Permitting Center. <br />
The URL can be used to link to this page
Your browser does not support the video tag.