Laserfiche WebLink
Exhibit A <br />City of San Marcos <br />Water Master Plan Update <br />Water Treatment Plant Imp. For ARWA Water <br />Project No. 2 <br />Level (Phase) No. and Description Principal Sr. ProjMgr Proj Mgr Proj Engr EIT Technician Clerical OC Total Labor Percent of <br />Level 3(Task) No. and Description (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) Hours Fee($$$) Total Fee <br />Water Treatment Plant Imp. For ARWA Water 80 0 332 36 860 180 50 34 1,672 $ 233,840 100.0% <br />1 Preliminary Engineering Services 16 0 40 24 62 14 12 12 180 $ 29,120 12.5% <br />1.1 Project Kick-off 4 6 4 14 $ 2,830 1.2% <br />_ 1.2 Developpumping system hydraulics _ _ _ 2 2 $ 480 0.2% <br />1.3 Conduct hydraulic transient analysis 2 2 $ 480 0.2% <br />1.4 Electrical improvements - 2 - 2 -W- $��� 480 5555 - 0.2% <br />55....55_ _ �.._�__.__...__._________._._ <br />1 5 Size ground storage tank 2 4 10 16 <br />�.� <br />1.6 Develop site layout _ m _ _ 2 8 16 8 34 $ 5,060 2.2% <br />1.7 Develop control narrative 4 8 16 7R A a Qon <br />rrepar1 rerc z I _�L` �0 5555)^_ I__ 22 I_` 6 _ I 12 I 4 54 $ 7,760 3.3% <br />2 Design Services 30 0 88 12 144 110 32 22 438 $ 66,350 28.4% <br />2.1 Attend progress meetings (4) _ 4 12 12 28 $ S,ODO 2.1 <br />2.2 Prepare drawings and specs B 40 80 80 20 12 240 $ 34,000 14.5% <br />2.3 Attend reviewmeefings and address comments 12 12 12 36 $ 7,320 3.1% <br />..___.__..___...___„__.�, ._._._._.___.__._. ..55...5.5.. ___�....._........ <br />_._..__._... .5555_. <br />2.4 Provide Final Bid Documents 2 12 20 30 12 8 84 $ 11,870 5.1% <br />2.5 Update OPCC 2 8 12 12 2 36 $ 5,800 2.5% <br />_...-._. _..5_800 <br />2.6 Submitfor Approvals 2 4 8 14 $ 2,360 1.0% <br />3 Bidding Assistance 2 0 30 0 50 32 6 0 120 $ 16,900 7.2% <br />3. i Provide Electronic copy of Bid Docs _ _ 4 _ 8 8 _ 4 24 $ 3,060 1.3% <br />_3.2 _ Assistin advertisement _4 _ _4 _ 2 10 $ _1,460 0.6% <br />3.3 Attend ProBidconference -� v 6� y8 14 $ 2,170 0.9% <br />3.4 Issue Addenda as appropriate 2 10 16 16 44 $ 6,370 2.7% <br />_.._ <br />3.5 Prepare Bid Tabulation and provide recommendation _ 2 _ 6 _ _ _ _ 8 $ 1,140 0.5% <br />3.6 Prepare Conformed Documents 4 8 _.8 20 - $ 2,700 1.2- <br />4 Construction Administration 32 0 174 0 604 24 0 0 834 $ 121,470 51.9% <br />4.1 Act as Client rep _ _ _ _20 _ _ 60 400 W_ 480 - $ 67,500 ----.28.9% <br />Participate in Pre -Construction Mfg ��. _ "" 4 _ __ fi __ _-.� _..-.-... a----- 10 $__ 1,530 �_� 0.7% <br />4.3 Review contractor schedules �� _ _ 2 Y .5555 6 8 $ W 1,140 0.5% <br />__4.4 Attendprogress_meetings_�__ s6 R _ 40 _ 60 _ 106 $� 17,040 <br />4.5 Receive and respond to RFls 2M 20 40 12 74 $ 10,860 4.6% <br />4.6 Recommend Change Orders 2 10 20 32 $ 5,030 2.2% <br />4.7 Review shop drawings 8 20 28 $ 4,060 1.7% <br />.5555_. .�______.���._,.�.___ .___._.__.__... _...___....___...._........._........_..._......____.._____.._. ...._�....__ __�.__ .__..._.____.. �...__._.._ . _ 55.5...5 ___________ <br />4.8 Render formal written decisions 2 _ 8_ _ 12 _ 22 _ $ 3,640 1.6% <br />4.9 Review Pay applications _ 8 _ 12 -- 20 $ 3,060 1.3% <br />..e..�. .5..5.55. �_.�.__._._ <br />4.1 Review O&M Manuals _ 4 _ e _ _ W 12 $ 1,780 0.8% <br />4.11 Conduct Final Walk -Through i 6 _ u 12 _ 5555_ _ 18 $ 2,670 1.1 <br />4.12 Prepare Record Drawings 4 i 8 12 24 $ 3.160 1.4 <br />Total Labor Hours <br />80 <br />0 <br />332 <br />36 <br />860 <br />180 <br />50 <br />34 <br />1,572 <br />CC <br />.__.__ <br />Ctvil Engr Consultant <br />___,..__._._..�.____.... <br />Total Labor Amount <br />_ <br />1.05 <br />__ <br />1 <br />RI <br />_Electrical <br />1 <br />1 <br />1 <br />1 1 <br />Geotechnical Consultant <br />$ 233,840 <br />100.0% <br />Total Amounts by Labor Category <br />$ 23,200 <br />$ - <br />$ 64,740 <br />$ 5,040 <br />$ 107,500 <br />$ 20,700 <br />$ 4,500 <br />$ 8,160 <br />$ 233,840 <br />$� - <br />Labor Category Percent of Total Labor <br />9.9% <br />0.0% <br />27.7% <br />2.2% <br />46.0% <br />8.9% <br />1.9% <br />3.5% <br />_�.�. <br />$ - <br />100.0% <br />TOTAL EXPENSES (see breakdown below) <br />$ .� �� 193,600 <br />1.05 <br />$ 203,280 <br />Total Subconsultanls <br />Travel, Meals, Lodging <br />$ 232,570 <br />1.05 <br />Total Reimbursables <br />C3 <br />__.._..„...__.._.___.._.___.___._.._._____...__...._.______._....._ <br />$ 14,028 <br />$ <br />Total Expenses <br />$ <br />$ 246,598 <br />GRAND TOTAL - Water Treatment Plant Imp. For ARWA <br />Water <br />$ 480,438 <br />SUBCONSULTANT EXPENSES RPIMRIIPSaRI F FYPCNSFR <br />Code <br />Description <br />Budget ($$) <br />Markup <br />Fee ($$$) <br />CA <br />Architect Consultant <br />$ <br />1.05 <br />$ <br />CC <br />.__.__ <br />Ctvil Engr Consultant <br />___,..__._._..�.____.... <br />$ <br />_ <br />1.05 <br />__ <br />$ <br />.____......... _ <br />RI <br />_Electrical <br />$ <br />1.05 <br />CG <br />Geotechnical Consultant <br />$ 27,895 <br />1.05 <br />$� 29,290 <br />RM <br />Mechanical Consultant <br />3,000 <br />_ <br />$ _ 3,150 <br />CO <br />Other Consultant <br />$ - <br />_ <br />1.05 <br />$� - <br />_ CS <br />Structural Consultant <br />�___._....._-..._..._.�_..._� <br />$ <br />1.05 <br />$ _ <br />CY <br />_..� <br />Surveying Consultant <br />_�.._�__._.._._....___.._._�___ <br />$ - <br />1.05 <br />_._......._...._......___�..._ <br />_�.�. <br />$ - <br />21 <br />HDR _ � <br />$ .� �� 193,600 <br />1.05 <br />$ 203,280 <br />C2_ <br />Travel, Meals, Lodging <br />_®...._ <br />1.05 <br />C3 <br />__.._..„...__.._.___.._.___.___._.._._____...__...._.______._....._ <br />Telecommunications v <br />$ <br />1.05 <br />$ <br />C4 <br />$ <br />1.05 <br />$ <br />C6 <br />$05 <br />$ <br />TOTAL SUBCONSULTANT EXPENSES <br />$ 221,495 <br />$1 232,570 <br />Marcos Water Resources Budget.xls)Project 3 <br />GBRA - 100%.._...__. <br />_ RA <br />Laboratory Analysis <br />$ <br />RC <br />CompuCer <br />$ 7,860 <br />1.05 <br />$ 8,253 <br />RH <br />Historical _ 5555_ v <br />$_1.05 <br />$ <br />�$�_._._. <br />RI <br />In -House Reproduction <br />$ <br />1.05 <br />Long Distance Telephon_ e <br />�$ <br />$_ _ <br />_ _ 1.05 <br />e <br />RM <br />Employee Mileage <br />3,000 <br />1.05 <br />$ _ 3,150 <br />RO <br />Other Expenses <br />$ _ <br />1.05 <br />$� <br />Purchased Services <br />�4 <br />_ <br />RRReproduction <br />_$_ 2,500_ <br />1.05 <br />$ 2,625 <br />_RS _ <br />Shippin_g, Delivery, Postage <br />_ <br />RT <br />Travel, Meals, Lodging <br />$ <br />1.05 <br />$ - <br />RU _ <br />Telecommunications v <br />S _ <br />1.00 <br />S <br />