|
Exhibit A
<br />City of San Marcos
<br />Water Master Plan Update
<br />Water Treatment Plant Imp. For ARWA Water
<br />Project No. 2
<br />Level (Phase) No. and Description Principal Sr. ProjMgr Proj Mgr Proj Engr EIT Technician Clerical OC Total Labor Percent of
<br />Level 3(Task) No. and Description (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) (hrs) Hours Fee($$$) Total Fee
<br />Water Treatment Plant Imp. For ARWA Water 80 0 332 36 860 180 50 34 1,672 $ 233,840 100.0%
<br />1 Preliminary Engineering Services 16 0 40 24 62 14 12 12 180 $ 29,120 12.5%
<br />1.1 Project Kick-off 4 6 4 14 $ 2,830 1.2%
<br />_ 1.2 Developpumping system hydraulics _ _ _ 2 2 $ 480 0.2%
<br />1.3 Conduct hydraulic transient analysis 2 2 $ 480 0.2%
<br />1.4 Electrical improvements - 2 - 2 -W- $��� 480 5555 - 0.2%
<br />55....55_ _ �.._�__.__...__._________._._
<br />1 5 Size ground storage tank 2 4 10 16
<br />�.�
<br />1.6 Develop site layout _ m _ _ 2 8 16 8 34 $ 5,060 2.2%
<br />1.7 Develop control narrative 4 8 16 7R A a Qon
<br />rrepar1 rerc z I _�L` �0 5555)^_ I__ 22 I_` 6 _ I 12 I 4 54 $ 7,760 3.3%
<br />2 Design Services 30 0 88 12 144 110 32 22 438 $ 66,350 28.4%
<br />2.1 Attend progress meetings (4) _ 4 12 12 28 $ S,ODO 2.1
<br />2.2 Prepare drawings and specs B 40 80 80 20 12 240 $ 34,000 14.5%
<br />2.3 Attend reviewmeefings and address comments 12 12 12 36 $ 7,320 3.1%
<br />..___.__..___...___„__.�, ._._._._.___.__._. ..55...5.5.. ___�....._........
<br />_._..__._... .5555_.
<br />2.4 Provide Final Bid Documents 2 12 20 30 12 8 84 $ 11,870 5.1%
<br />2.5 Update OPCC 2 8 12 12 2 36 $ 5,800 2.5%
<br />_...-._. _..5_800
<br />2.6 Submitfor Approvals 2 4 8 14 $ 2,360 1.0%
<br />3 Bidding Assistance 2 0 30 0 50 32 6 0 120 $ 16,900 7.2%
<br />3. i Provide Electronic copy of Bid Docs _ _ 4 _ 8 8 _ 4 24 $ 3,060 1.3%
<br />_3.2 _ Assistin advertisement _4 _ _4 _ 2 10 $ _1,460 0.6%
<br />3.3 Attend ProBidconference -� v 6� y8 14 $ 2,170 0.9%
<br />3.4 Issue Addenda as appropriate 2 10 16 16 44 $ 6,370 2.7%
<br />_.._
<br />3.5 Prepare Bid Tabulation and provide recommendation _ 2 _ 6 _ _ _ _ 8 $ 1,140 0.5%
<br />3.6 Prepare Conformed Documents 4 8 _.8 20 - $ 2,700 1.2-
<br />4 Construction Administration 32 0 174 0 604 24 0 0 834 $ 121,470 51.9%
<br />4.1 Act as Client rep _ _ _ _20 _ _ 60 400 W_ 480 - $ 67,500 ----.28.9%
<br />Participate in Pre -Construction Mfg ��. _ "" 4 _ __ fi __ _-.� _..-.-... a----- 10 $__ 1,530 �_� 0.7%
<br />4.3 Review contractor schedules �� _ _ 2 Y .5555 6 8 $ W 1,140 0.5%
<br />__4.4 Attendprogress_meetings_�__ s6 R _ 40 _ 60 _ 106 $� 17,040
<br />4.5 Receive and respond to RFls 2M 20 40 12 74 $ 10,860 4.6%
<br />4.6 Recommend Change Orders 2 10 20 32 $ 5,030 2.2%
<br />4.7 Review shop drawings 8 20 28 $ 4,060 1.7%
<br />.5555_. .�______.���._,.�.___ .___._.__.__... _...___....___...._........._........_..._......____.._____.._. ...._�....__ __�.__ .__..._.____.. �...__._.._ . _ 55.5...5 ___________
<br />4.8 Render formal written decisions 2 _ 8_ _ 12 _ 22 _ $ 3,640 1.6%
<br />4.9 Review Pay applications _ 8 _ 12 -- 20 $ 3,060 1.3%
<br />..e..�. .5..5.55. �_.�.__._._
<br />4.1 Review O&M Manuals _ 4 _ e _ _ W 12 $ 1,780 0.8%
<br />4.11 Conduct Final Walk -Through i 6 _ u 12 _ 5555_ _ 18 $ 2,670 1.1
<br />4.12 Prepare Record Drawings 4 i 8 12 24 $ 3.160 1.4
<br />Total Labor Hours
<br />80
<br />0
<br />332
<br />36
<br />860
<br />180
<br />50
<br />34
<br />1,572
<br />CC
<br />.__.__
<br />Ctvil Engr Consultant
<br />___,..__._._..�.____....
<br />Total Labor Amount
<br />_
<br />1.05
<br />__
<br />1
<br />RI
<br />_Electrical
<br />1
<br />1
<br />1
<br />1 1
<br />Geotechnical Consultant
<br />$ 233,840
<br />100.0%
<br />Total Amounts by Labor Category
<br />$ 23,200
<br />$ -
<br />$ 64,740
<br />$ 5,040
<br />$ 107,500
<br />$ 20,700
<br />$ 4,500
<br />$ 8,160
<br />$ 233,840
<br />$� -
<br />Labor Category Percent of Total Labor
<br />9.9%
<br />0.0%
<br />27.7%
<br />2.2%
<br />46.0%
<br />8.9%
<br />1.9%
<br />3.5%
<br />_�.�.
<br />$ -
<br />100.0%
<br />TOTAL EXPENSES (see breakdown below)
<br />$ .� �� 193,600
<br />1.05
<br />$ 203,280
<br />Total Subconsultanls
<br />Travel, Meals, Lodging
<br />$ 232,570
<br />1.05
<br />Total Reimbursables
<br />C3
<br />__.._..„...__.._.___.._.___.___._.._._____...__...._.______._....._
<br />$ 14,028
<br />$
<br />Total Expenses
<br />$
<br />$ 246,598
<br />GRAND TOTAL - Water Treatment Plant Imp. For ARWA
<br />Water
<br />$ 480,438
<br />SUBCONSULTANT EXPENSES RPIMRIIPSaRI F FYPCNSFR
<br />Code
<br />Description
<br />Budget ($$)
<br />Markup
<br />Fee ($$$)
<br />CA
<br />Architect Consultant
<br />$
<br />1.05
<br />$
<br />CC
<br />.__.__
<br />Ctvil Engr Consultant
<br />___,..__._._..�.____....
<br />$
<br />_
<br />1.05
<br />__
<br />$
<br />.____......... _
<br />RI
<br />_Electrical
<br />$
<br />1.05
<br />CG
<br />Geotechnical Consultant
<br />$ 27,895
<br />1.05
<br />$� 29,290
<br />RM
<br />Mechanical Consultant
<br />3,000
<br />_
<br />$ _ 3,150
<br />CO
<br />Other Consultant
<br />$ -
<br />_
<br />1.05
<br />$� -
<br />_ CS
<br />Structural Consultant
<br />�___._....._-..._..._.�_..._�
<br />$
<br />1.05
<br />$ _
<br />CY
<br />_..�
<br />Surveying Consultant
<br />_�.._�__._.._._....___.._._�___
<br />$ -
<br />1.05
<br />_._......._...._......___�..._
<br />_�.�.
<br />$ -
<br />21
<br />HDR _ �
<br />$ .� �� 193,600
<br />1.05
<br />$ 203,280
<br />C2_
<br />Travel, Meals, Lodging
<br />_®...._
<br />1.05
<br />C3
<br />__.._..„...__.._.___.._.___.___._.._._____...__...._.______._....._
<br />Telecommunications v
<br />$
<br />1.05
<br />$
<br />C4
<br />$
<br />1.05
<br />$
<br />C6
<br />$05
<br />$
<br />TOTAL SUBCONSULTANT EXPENSES
<br />$ 221,495
<br />$1 232,570
<br />Marcos Water Resources Budget.xls)Project 3
<br />GBRA - 100%.._...__.
<br />_ RA
<br />Laboratory Analysis
<br />$
<br />RC
<br />CompuCer
<br />$ 7,860
<br />1.05
<br />$ 8,253
<br />RH
<br />Historical _ 5555_ v
<br />$_1.05
<br />$
<br />�$�_._._.
<br />RI
<br />In -House Reproduction
<br />$
<br />1.05
<br />Long Distance Telephon_ e
<br />�$
<br />$_ _
<br />_ _ 1.05
<br />e
<br />RM
<br />Employee Mileage
<br />3,000
<br />1.05
<br />$ _ 3,150
<br />RO
<br />Other Expenses
<br />$ _
<br />1.05
<br />$�
<br />Purchased Services
<br />�4
<br />_
<br />RRReproduction
<br />_$_ 2,500_
<br />1.05
<br />$ 2,625
<br />_RS _
<br />Shippin_g, Delivery, Postage
<br />_
<br />RT
<br />Travel, Meals, Lodging
<br />$
<br />1.05
<br />$ -
<br />RU _
<br />Telecommunications v
<br />S _
<br />1.00
<br />S
<br />
|