My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-188/approving amendment No. 1 to the first amended and restated Regional Project Agreement with the Guadalupe-Blanco River Authority (GBRA) to provide for additional treated groundwater from the Carrizo-Wilcox Aquifer made available by the Allia
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-188/approving amendment No. 1 to the first amended and restated Regional Project Agreement with the Guadalupe-Blanco River Authority (GBRA) to provide for additional treated groundwater from the Carrizo-Wilcox Aquifer made available by the Allia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:13:20 AM
Creation date
10/16/2019 11:05:34 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2019-188
Date
9/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(15) "Point of Delivery" means the point on the Plant Site at which the <br />City will deliver to GBRA treated surface and ground water supplied <br />hereunder, as such point is described on Exhibit 2. <br />(16) "Point of Diversion' means the point on the Guadalupe River at <br />which GBRA will divert raw water to be supplied hereunder, as such <br />point is described on Exhibit 3. <br />(17) "Project Debt Instruments" means all notes, bonds, or other <br />financial obligations made to construct, complete, improve, or repair <br />the Raw Water Delivery System or the Plant. The City or GBRA <br />may be the obligor on these instruments. <br />(18) "Project" or the "San Marcos Regional Water Supply Project" <br />means the regional surface water supply project contemplated by <br />this Agreement, which consists of the Raw Water Delivery System <br />and the Plant. <br />(19) "Raw Water Delivery System" means all facilities designed and <br />constructed by GBRA for diverting water from Guadalupe River at <br />the Point of Diversion to the Plant pursuant to this Agreement, all <br />other facilities that may be agreed upon by the Parties designed and <br />constructed by GBRA for diverting water from other sources to the <br />Plant or for storage of raw water prior to treatment, together with all <br />lands and interests in land on which such facilities are located. <br />(20) "Raw Water Delivery System Annual Requirement" means the <br />total amount of money required for GBRA to pay all Operation and <br />Maintenance Expenses of the Raw Water Delivery System, to pay <br />the debt service on any Raw Water Delivery System Project Debt <br />Instruments, and to maintain balances in any special or reserve funds <br />required by the provisions of any Raw Water Delivery System <br />Project Debt Instruments. <br />(21) "Surface Water" means water from the Guadalupe River or other <br />surface water sources supplied to the Plant pursuant to the Water <br />Purchase Contract between GBRA and the City, dated October 10 <br />1989. as amended. <br />2. Section 3, Rights after Termination, is hereby amended to read as follows: <br />Section 3. Rights after Termination. <br />Except as specifically provided otherwise in this Agreement, all of the rights <br />and obligations of the Parties under this Agreement shall terminate upon <br />termination of this Agreement, except that such termination shall not affect the <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.