Laserfiche WebLink
CHEATHAM STREET FLATS <br />Public Improvements Construction Project - Engineers Opinion of Probable Cost Revised 9-15-2019 <br />Ailey Replacement Grove to Cheatham <br />QuantityItem Unit <br />Saw cut existing paving (at juncture with street, both ends) <br />$85,316 <br />80___ <br />_3 <br />$240 <br />Demo existing paving excavate to base depth of 1.0') — <br />—LF--- <br />CY <br />228 <br />$6 <br />— <br />$1,368 <br />Valley gutter (at juncture with street, both ends) <br />Moisture Conditioned Compacted subgrade <br />_ _ <br />Base, 6" compacted road base Inc, grading <br />_---_ <br />LF <br />SY <br />SY <br />80 -'- <br />754 <br />754 <br />$12 <br />$3 <br />_$17 _ <br />$960 <br />$2,261 <br />_ $12,667 <br />— — —_ — <br />— <br />Wearing Course, 6" reinforced CIP Concrete 4500 PSI Concrete <br />SY <br />1 754 <br />$90 <br />$67,821 <br />Subtotal, Hard Costs <br />Soft Costs <br />$85,316 <br />Surveying & Layout _ <br />`$1,280 <br />_ _ _ <br />Permitting & Inspections <br />_ <br />$0 <br />Traffic Control <br />--------- <br />------------------------------------- <br />Material Testing <br />_$1,280 <br />$853 <br />As-Builts <br />$427 <br />Design & Engineering_— <br />------------------- <br />$0 <br />Contingency (1 OV&) <br />$8,532 <br />Subtotal, Civil work <br />$12,371 <br />_ <br />Total, Alley Replacement_ Grove to Cheatham <br />$97,687 <br />Maintenance Bond (on 20% of cost for one year) <br />Performance Bond <br />_ <br />$256 <br />$1,280 <br />Proiect Total <br />$ 99.223 <br />COSM Cost Share % 50 $ - <br />—---------------------------------------------------------------- — <br />CSF Cost Share % 50 —$ --99,223 <br />PICP Summary - Page 2 - 11-20-2019 <br />