My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-261/approving a developer participation agreement with Cheatham Street Flats, LLC providing for the City to participate in the costs of a Wastewater line replacement and extension, and waterline connections in the vicinity of Cheatham Street bet
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-261/approving a developer participation agreement with Cheatham Street Flats, LLC providing for the City to participate in the costs of a Wastewater line replacement and extension, and waterline connections in the vicinity of Cheatham Street bet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 3:12:21 PM
Creation date
1/7/2020 10:06:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-261
Date
12/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHEATHAM STREET FLATS <br />Public Improvements Construction Project - Engineers Opinion of Probable Cost Revised 9-15-2019 <br />Ailey Replacement Grove to Cheatham <br />QuantityItem Unit <br />Saw cut existing paving (at juncture with street, both ends) <br />$85,316 <br />80___ <br />_3 <br />$240 <br />Demo existing paving excavate to base depth of 1.0') — <br />—LF--- <br />CY <br />228 <br />$6 <br />— <br />$1,368 <br />Valley gutter (at juncture with street, both ends) <br />Moisture Conditioned Compacted subgrade <br />_ _ <br />Base, 6" compacted road base Inc, grading <br />_---_ <br />LF <br />SY <br />SY <br />80 -'- <br />754 <br />754 <br />$12 <br />$3 <br />_$17 _ <br />$960 <br />$2,261 <br />_ $12,667 <br />— — —_ — <br />— <br />Wearing Course, 6" reinforced CIP Concrete 4500 PSI Concrete <br />SY <br />1 754 <br />$90 <br />$67,821 <br />Subtotal, Hard Costs <br />Soft Costs <br />$85,316 <br />Surveying & Layout _ <br />`$1,280 <br />_ _ _ <br />Permitting & Inspections <br />_ <br />$0 <br />Traffic Control <br />--------- <br />------------------------------------- <br />Material Testing <br />_$1,280 <br />$853 <br />As-Builts <br />$427 <br />Design & Engineering_— <br />------------------- <br />$0 <br />Contingency (1 OV&) <br />$8,532 <br />Subtotal, Civil work <br />$12,371 <br />_ <br />Total, Alley Replacement_ Grove to Cheatham <br />$97,687 <br />Maintenance Bond (on 20% of cost for one year) <br />Performance Bond <br />_ <br />$256 <br />$1,280 <br />Proiect Total <br />$ 99.223 <br />COSM Cost Share % 50 $ - <br />—---------------------------------------------------------------- — <br />CSF Cost Share % 50 —$ --99,223 <br />PICP Summary - Page 2 - 11-20-2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.