Laserfiche WebLink
12.2.4. SMEU will provide breaker failure initiate contacts from its circuit breaker <br />35800 relaying panel to LCRA TSC's 138-kV bus differential & breaker <br />failure relaying panel. <br />12.2.5. SMEU will supply and allow LCRA TSC use of circuit breaker 35800 relaying <br />bushing current transformer for its 138-kV bus differential relaying scheme. <br />12.2.6. LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />12.3. Physical <br />12.3.1. SMEU and LCRA TSC are to share access to the substation by LCRA TSC <br />locks in the gate. <br />12.3.2. LCRA TSC will share access to the LCRA TSC control house. Access is <br />obtained by calling LCRA TSC's System Operations Control Center using the <br />intercom at the door of the control house. <br />12.3.3. SMEU will design, construct, and own the ground grid. SMEU will coordinate <br />the design and construction of the ground grid to allow LCRA TSC to make <br />grounding connections to LCRA TSC equipment. <br />12.4. Real Estate <br />12.4.1. SMEU shall convey to LCRA TSC a perpetual and exclusive electric <br />substation easement, in a form approved by LCRA TSC, for the real property <br />underlying the LCRA TSC facilities in the Rattler Substation. <br />12.4.2. SMEU shall convey to LCRA TSC a perpetual access easement, in a form <br />approved by LCRA TSC, to Rattler Substation that provides good and <br />adequate rights of vehicular ingress and egress to and from a public road. <br />12.4.3. SMEU will convey two (2) perpetual transmission line easements in a form <br />acceptable to LCRA TSC for the portion of real property underlying the LCRA <br />TSC Transmission Lines. <br />12.4.4. LCRA TSC's acquisition of the access, transmission line, and substation <br />easements are subject to LCRA TSC's review and acceptance of a field survey, <br />legal documentation, title commitment and title insurance policy, to be <br />acquired at SMEU's expense on behalf of LCRA TSC, as well as archeological <br />research and an environmental assessment conducted by LCRA TSC. In no <br />event shall the access, transmission line, and substation easements be subject <br />to any lien or any other encumbrance unacceptable to LCRA TSC. If LCRA <br />TSC finds the access, transmission line, and substation easements to be <br />acceptable, and subject to any required approval by the LCRA TSC Board, <br />LCRA TSC will offer to pay the seller an amount for the associated easements <br />equal to their market value as determined by LCRA TSC. <br />12.5. Site Development <br />12.5.1. SMEU will acquire the Rattler Substation site and perform or cause to be <br />performed the site grading for the substation yard. LCRA TSC will review and <br />approve the grading plan and reimburse SMEU for LCRA TSC's proportionate <br />share of the site grading costs. <br />12.5.2. SMEU shall design, construct, and maintain any required detention pond(s). <br />12.5.3. SMEU will acquire any necessary permits required for development of the <br />Substation Site. <br />LCRA TSC — San Marcos Electric Utility Amendment No. 2 Page 6 of 8 <br />