My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-036
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2008 2:25:06 PM
Creation date
3/4/2008 9:02:13 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-36
Date
3/3/2008
Volume Book
174
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
drawings showing significant changes in the work made during the construction phase. <br />1.7.28 Ensure that all notices and signs required and provided by the City are posted in the <br />appropriate locations at the Project site by the Contractor. <br />1.7.29 Conduct final inspection with the City and prepare a punch list prior to final acceptance <br />by the City. <br />1.7.30 Prior to the end of the one year warranty period, review the completed Project with the <br />City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limitations of authority of the Engineer as the City's representative during <br />construction will not be modified or extended after the construction contract documents have <br />been authorized by the City to be competitively bid without written consent of the City and the <br />Engineer and with notice to the Contractor. <br />1.8 ADDITIONAL SERVICES/CHANGE IN SERVICES <br />1.8.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for Additional <br />Services will only be for substantial deviations from the scope of services described in this <br />Agreement. The Engineer will submit a written estimate of fees to the City and obtain the City's <br />authorization before initiating any additional services. <br />1.8.2 In the event that any of the following assumptions change, and the Engineer's services <br />are required in association with the following items, such work will be considered an additional <br />service(s) and will be subject to the provisions of this Subsection: <br />a) Planimetric Surveys are not anticipated to be required to be performed by the <br />Engineer for this Project. The City will supply the Engineer all planimetric 2D and <br />3D survey information. <br />b) No environmental studies or clearance will be required to be obtained by the <br />Engineer. The City will coordinate any environmental issues that may occur. <br />Construction related clearances, including permits, will be obtained by the <br />construction contractor. <br />1.8.3 Each material change (deletion or addition) in the services to be provided by Engineer <br />must be authorized by the City on the Authorization of Change in Services form attached to this <br />Agreement as Attachment B. Compensation for additional services will be in addition to that <br />specified for Basic Services in accordance with Section 15.3 of this Agreement. The approval of <br />the City's governing body is necessary for all additional services the compensation for which <br />exceeds $50,000.00. <br />KBR McCarty Agreement 2008 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.