Laserfiche WebLink
Proposed Amendment #9 to the City of San Marcos Action Plan for Disaster Recovery <br />March 3, 2020 <br />The City proposes the following changes to the City of San Marcos Action Plan for Disaster Recovery as <br />Amendment No. 9 to the document. <br />Regarding eligibility for Single Family Housing Rehabilitation and Reconstruction: <br />Page 33 (Page 47 of the electronic document): Under "Owner Occupied Applicant Eligibility <br />Requirements" change "updated 100 -year floodplain" to "City Limits of San Marcos and have been <br />damaged as a result of one or both of the major two floods in 2015.". <br />Page 34 (Page 48 of the electronic document): Under "Single Family 1-4 Unit Rental Applicant Eligibility <br />Requirements" change "updated 100 -year floodplain" to "City Limits of San Marcos". <br />Regarding the Blanco-Riverine Improvements Project: <br />Page 23 (Page 37 of the electronic document): Add note stating, "Substantial Amendment #9 changes <br />the use of funds for the Blanco-Riverine project from infrastructure construction to acquisition. <br />Construction funds will be provided by other sources." <br />Page 36 (Page 50 of the electronic document): Adding "including land acquisition" to the following <br />sentence, as shown here: "H. Hazard Mitigation activities including land acquisition: Blanco Riverine <br />Improvements" <br />Page 282 of the electronic document: Add "along with..." to end of sentence, as shown here: "Eligibility <br />Criteria (Infrastructure): Typical infrastructure activities include the repair, replacement, or relocation of <br />damaged public facilities and improvements to include, but not be limited to, bridges, water treatment <br />facilities, roads, and sewer and water lines, along with acquisition of land needed to complete these <br />activities." <br />Page 285 of the electronic document: Add note to the paragraph entitled "Proposed Infrastructure": <br />"CDBG-DR funds will be used for land acquisition to support this project." <br />Page 291 of the electronic document: On the table entitled CDBG-DR Funded Infrastructure Projects, <br />add note to the Blanco-Riverine Improvements project under Project Description: "CDBG-DR funds will <br />be used for land acquisition to support this project." <br />