Laserfiche WebLink
no elevation $45.000 <br />with elevation | $6000 <br />Unit)—������ $196800 <br />Single Family Rental Reconstruction w/ elevation (1 -4 <br />D. Infrastructure <br />The City will designate $12.5million toinfrastructure projects that will alleviate repetitive loss, <br />inundation, and recurring flooding. Any match funding activities will be compliant with CDBG-DR <br />eligibility requirements as well as other federal regulations that may apply. Activities undertaken will <br />focus on projects under the FEMA Public Assistance Categories as listed in the Needs <br />Assessment above' on well as address the Hazard Mitigation measures designed tnreduce future <br />repetitive losses. Eligible projects (defined bythe Category they may fall under) may include but are <br />not limited to: The projects highlighted in the blue color are projects that will be implemented <br />ua/ngCDBGDRfunds msdirected by[Jb/Counuii <br />A. Debris Removal (none proposed aathis isenimmediate Disaster Recovery level activity and <br />not eligible for CDBG-DF<fundo); <br />B. Emergency Protective Measures; <br />o. Develop early warning systems <br />b. Deploy Reverse Callback systems <br />c. Construct Flood gates and barriers <br />C. Road Systems mndfBriugma; 0Vkytomm, Clarewood/Barbara (Activity Tenn/nabam0, Blanco <br />Gardens, Uh/andProjects <br />a. Culvert repair/replacement <br />b. Drainage ditch repair/replacement <br />c. /# risk road segment repair/replacement <br />d. Bridgerepair/nap|ecement <br />D. Water Control Facilities; <br />a. Repairs hnwater treatment plants <br />E. Buildings, Contents, and Equipment; <br />a. Repair and replacement ofCity owned buildings, equipment, facilities and vehicles ifnot <br />covered byinsurance oranother funding source <br />F. Utilities; Midtown, C/orevvmod/Banharm (Activity Tenn/nmhmo), Blanco Gardens, Uhbnd <br />Projects <br />a. Storm sewer system upgrades <br />b. Creation ufnew drainage systems and lines <br />G. Parke' recreation and other facilities; and <br />H. Hazard Mitigation activities including land acquisition: Blanco RYverh,eImprovements <br />The City may also elect to participate in a U.S. Army Corps of Engineers projects as well by <br />contributing the Chief's Report with u max contribution of $250,000.00, but specific projects <br />under this Activity have not currently been identified. <br />Potential flood recovery projects were included within the 1O-yearCapital Improvement Plan <br />adopted byCity Council and are attached in Appendix J. The projects were identified through the <br />unmet needs process and are all located in the area most impacted bythe floods and in census <br />tneota meeting L[N| requirements. The list includes anticipated funding needs and project schedules. <br />Using HUD -DR planning funds, a Feasibility Study was conducted to prioritize the infrastructure <br />projects. The privatization matrix inc|uded, in order of most important and that will have the <br />most positive impact onthe community: <br />* Impact holow tomoderate income population; <br />* Reduction inwater surface elevations; <br />* Benefit to cost ratios; <br />36 | Paga <br />p.5Oofthe electronic document <br />