My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2020-086/approving an Advanced Funding Agreement (AFA) with the State of Texas, acting through the Texas Department of Transportation (CSJ No. 0016-03-114),for drainage and landscaping betterments along IH-35 from south of SH 80 (Hopkins St) to north
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2020
>
Res 2020-086/approving an Advanced Funding Agreement (AFA) with the State of Texas, acting through the Texas Department of Transportation (CSJ No. 0016-03-114),for drainage and landscaping betterments along IH-35 from south of SH 80 (Hopkins St) to north
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 8:49:24 AM
Creation date
5/8/2020 10:03:19 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2020-86
Date
4/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CSJ # 0016-03-114 <br />District # 14-AUS <br />Code Chart 64 # 37950 <br />SH 123 Drainage and Landscape <br />Project Name <br />Betterment <br /> <br /> <br />10. Insurance <br />If this Agreement authorizes the Local Government or its contractor to perform any work <br />on State right of way, before beginning work the entity performing the work shall provide <br />the State with a fully executed copy of the State's Form 1560 Certificate of Insurance <br />verifying the existence of coverage in the amounts and types specified on the Certificate <br />of Insurance for all persons and entities working on State right of way. This coverage <br />shall be maintained until all work on the State right of way is complete. If coverage is not <br />maintained, all work on State right of way shall cease immediately, and the State may <br />recover damages and all costs of completing the work. <br /> <br />11. Project Maintenance <br />The Local Government shall be responsible for maintenance of locally owned roads and <br />locally owned facilities after completion of the work. The State shall be responsible for <br />maintenance of the State highway system after completion of the work if the work was <br />on the State highway system, unless otherwise provided for in Attachment A or existing <br />maintenance agreements with the Local Government. <br /> <br />12. Termination <br />A. This agreement may be terminated in the following manner: <br />1. By mutual written agreement and consent of both parties; <br />2. By either party upon the failure of the other party to fulfill the obligations set <br />forth in this agreement; or <br />3. By the State if it determines that the performance of the Project is not in the <br />best interest of the State. <br />B. If the agreement is terminated in accordance with the above provisions, the Local <br />Government will be responsible for the payment of Project costs incurred by the <br />State on behalf of the Local Government up to the time of termination. <br />C. Upon completion of the Project, the State will perform an audit of the Project <br />costs. Any funds due to the Local Government, the State, or the Federal <br />Government will be promptly paid by the owing party. <br /> <br />13. Notices <br />All notices to either party by the other required under this agreement shall be delivered <br />personally or sent by certified or U.S. mail, postage prepaid or sent by electronic mail, <br />(electronic notice being permitted to the extent permitted by law but only after a separate <br />written consent of the parties), addressed to such party at the following addresses: <br /> <br />Local Government: State: <br /> <br />City of San Marcos Texas Department of Transportation <br />Attn.: Director of Engineering Attn.: Director of Contract Services <br />th <br />630 East Hopkins Street 125 E. 11 Street <br />San Marcos, TX 78666 Austin, TX 78701 <br /> <br /> <br />Page 4 of 6 <br />AFA VolTIP Revised 10/13/2017 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.