Laserfiche WebLink
BLUEBONNET ELECTRIC COOP <br />HILLS OF HAYS DETENTION POND <br />TRENCH INSTALLATION DETAIL <br />ATIVE BACKFILL <br />ARNING TAPE <br />>" RED CONCRETE CAP <br />UEBONNET PRIMARY CONDUIT <br />�TIVE BACKFILL <br />UNDISTURBED EARTH <br />Width as necessary for <br />adequate spacing. <br />NOTES: <br />1. BEC TO USE OPEN TRENCH METHOD FOR CONDUIT INSTALLATION. <br />3. FINISHED GRADE WILL BE SET TO EXISTING ELEVATION AT THE START OF <br />CONSTRUCTION. <br />