intersections, signage, utility infrastructure, drainage infrastructure including drainage
<br />infrastructure flowing to the District detention pond shown on Exhibit H, street lighting,
<br />landscaping, irrigation and re -vegetation of all disturbed areas within the right-of-way are
<br />included. The street improvements will provide a benefit to each Lot within the District.
<br />■ Lift Station & Wastewater Line D
<br />Improvements including trench excavation and embedment, trench safety, piping,
<br />manholes, service connections, testing, related earthwork, excavation, and erosion
<br />control and all necessary appurtenances constructed to City standards required to
<br />provide wastewater service to the District.
<br />311111111FROMM
<br />Susurro Parkway — Improvements including subgrade stabilization (including subgrade
<br />treatment, lime stabilization, road base import and compaction), concrete and reinforcing
<br />steel for roadways and sidewalks, material and compaction testing, handicapped ramps,
<br />and streetlights. All related earthwork, excavation, erosion control, retaining walls,
<br />intersections, signage, utility infrastructure, drainage infrastructure including drainage
<br />infrastructure flowing to the District detention pond shown on Exhibit H, street lighting,
<br />landscaping, irrigation and re -vegetation of all disturbed areas within the right-of-way are
<br />included. The street improvements will provide a benefit to each Lot within the District.
<br />■ Offsite Wastewater Line 8
<br />Improvements including trench excavation and embedment, trench safety, piping,
<br />manholes, service connections, testing, related earthwork, excavation, and erosion
<br />control and all necessary appurtenances required to provide wastewater service to the
<br />District.
<br />■ Detention Pond
<br />Improvements providing drainage, detention and water quality treatment of stormwater
<br />runoff serving the District and the other Major Improvements, including without
<br />limitation the detention basin, water quality facilities, and related drainage inlets, swales,
<br />storm sewers, culverts and outfall structures located in the area shown on Exhibit H. All
<br />related earthwork, excavation, erosion control, retaining walls, drainage infrastructure,
<br />landscaping, irrigation and re -vegetation of all disturbed areas within the detention pond
<br />area are included. The detention pond will provide a benefit to each Lot within the
<br />District.
<br />■ Soft Costs/Construction Management
<br />Includes engineering, geotechnical, permitting, inspection, surveying, design, and other
<br />professional fees and 4.0% construction management fee.