Laserfiche WebLink
intersections, signage, utility infrastructure, drainage infrastructure including drainage <br />infrastructure flowing to the District detention pond shown on Exhibit H, street lighting, <br />landscaping, irrigation and re -vegetation of all disturbed areas within the right-of-way are <br />included. The street improvements will provide a benefit to each Lot within the District. <br />■ Lift Station & Wastewater Line D <br />Improvements including trench excavation and embedment, trench safety, piping, <br />manholes, service connections, testing, related earthwork, excavation, and erosion <br />control and all necessary appurtenances constructed to City standards required to <br />provide wastewater service to the District. <br />311111111FROMM <br />Susurro Parkway — Improvements including subgrade stabilization (including subgrade <br />treatment, lime stabilization, road base import and compaction), concrete and reinforcing <br />steel for roadways and sidewalks, material and compaction testing, handicapped ramps, <br />and streetlights. All related earthwork, excavation, erosion control, retaining walls, <br />intersections, signage, utility infrastructure, drainage infrastructure including drainage <br />infrastructure flowing to the District detention pond shown on Exhibit H, street lighting, <br />landscaping, irrigation and re -vegetation of all disturbed areas within the right-of-way are <br />included. The street improvements will provide a benefit to each Lot within the District. <br />■ Offsite Wastewater Line 8 <br />Improvements including trench excavation and embedment, trench safety, piping, <br />manholes, service connections, testing, related earthwork, excavation, and erosion <br />control and all necessary appurtenances required to provide wastewater service to the <br />District. <br />■ Detention Pond <br />Improvements providing drainage, detention and water quality treatment of stormwater <br />runoff serving the District and the other Major Improvements, including without <br />limitation the detention basin, water quality facilities, and related drainage inlets, swales, <br />storm sewers, culverts and outfall structures located in the area shown on Exhibit H. All <br />related earthwork, excavation, erosion control, retaining walls, drainage infrastructure, <br />landscaping, irrigation and re -vegetation of all disturbed areas within the detention pond <br />area are included. The detention pond will provide a benefit to each Lot within the <br />District. <br />■ Soft Costs/Construction Management <br />Includes engineering, geotechnical, permitting, inspection, surveying, design, and other <br />professional fees and 4.0% construction management fee. <br />uu�i�uiuuui��u�u�u���i�iu�w�uuiuiuiui�iui�u�uro�u�iu�����uimuiuw�uuu �mnu�uuuuuuuu�u�wtiwui�utiw��w�muuitiiii��mioii�uuu�w�m������mmioui�m��i� �uiouoiu!�u��wi6�i���m�auiuiurvcp�iuiuiuiuuiu�u�uuuuuuuuuuu�ium�armiumuuiHdihuu���sntitii�7ihuuui�ss�oiouuuuuihA�i�uocs�w <br />WHISPER PID SAP 11 <br />