Laserfiche WebLink
Section 1.05. Billing. The City will furnish Hays Energy with an itemized monthly billing <br />statement showing 1) the volume of Wastewater measured at the Transfer Point in 1,000 -gallon <br />increments and the amounts due for Routine Treatment of the Wastewater at the then current <br />applicable wastewater rate; and 2) the amount of any surcharge due under the City's industrial <br />wastewater discharge regulations. <br />Article 2. Obligations of HUs Ene= <br />Section 2.01. Payments. <br />A. Hays Energy will pay to the City at the then prevailing rate per 1,000 gallons <br />for the Routine Treatment of the Wastewater, plus any applicable surcharges due under the <br />City's industrial wastewater discharge regulations, at the City's billing offices in San <br />Marcos, Texas, within twenty-five days after receipt of the itemized statement each month. <br />This rate will change proportionally as changes are made by the City in the residential retail <br />wastewater volume charge. <br />B. Hays Energy will pay to the City the amounts of all federal, state, and local <br />taxes, fees, and minimum monthly or other charges that may be applicable to the provision <br />of wastewater treatment services under this Contract. <br />C. Hays Energy will pay a minimum monthly charge of $500.00. <br />Section 2.02. Operation of Wastewater Line. Hays Energy will dispose only of process <br />wastewater from the Facility through the Wastewater Line, and the City will not permit any <br />connections to be made to the Wastewater Line for the disposal of untreated wastewater without <br />the written consent of Hays Energy. except as provided in Section 2.04. <br />Section 2.03. Facility Operation. <br />A. Hays Energy will operate the Facility so that routine discharges of the <br />Wastewater are treated and disposed of through zero liquid discharge equipment at the <br />Facility. Hays Energy will utilize all commercially reasonable efforts to construct, maintain <br />and operate its zero -discharge equipment in fully functional condition at all times, and to <br />discharge the Wastewater to the Wastewater Line only during periods in which Hays <br />Energy's zero liquid discharge equipment is not operational. Hays Energy agrees to use all <br />reasonable means to keep the duration of such periods to a minimum. When discharge of <br />the Wastewater by Hays Energy to the Wastewater Line is necessary, Hays Energy will <br />provide immediate notice to the City's wastewater treatment plant personnel, and will <br />ensure that the Wastewater discharged at the Transfer Point meets the following <br />parameters: <br />Characteristic Parameter <br />Volume Not more than 900,000 gallons per day <br />Discharge Rate Not more than 625 gallons per minute <br />Temperature Not more than 88° F <br />B. The Wastewater discharged at the Transfer Point must meet all applicable <br />requirements of the Laws and Regulations (as defined below) governing wastewater flows <br />to the Treatment Plant. The parties anticipate that the Routine Treatment may not be <br />sufficient for adequate treatment of the Wastewater, and Hays Energy agrees to have <br />pretreatment facilities and processes in place to meet the City's industrial wastewater <br />discharge regulations prior to initiating discharge of the Wastewater to the Wastewater <br />Line. <br />C. To ensure the City's compliance with its state wastewater discharge permit, <br />protect river ecosystems, and comply with applicable stream standards, the City reserves <br />the right to limit Hays Energy's discharge volume and rate, to require Hays Energy to <br />schedule its discharges, and to require Hays Energy to temporarily cease its discharges, <br />when the San Marcos River flows are at or below 100 CFS at the closest USGS gauging <br />station above the City's wastewater discharge point on the river. <br />