My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-131
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2010 3:09:17 PM
Creation date
10/12/2009 9:38:42 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Grant Application
Number
2009-131
Date
10/5/2009
Volume Book
183
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iii) The SUBCONTRACTOR is allowed to account for expenses incurred and request <br />reimbursement of outlays under either a cash or an accrual basis, as defined and <br />authorized under the UGMS. To be eligible for reimbursement under this Contract, a <br />cost must have been incurred and either paid by the SUBCONTRACTOR prior to <br />claiming reimbursement from CAPCOG or incurred by the last day of the time period <br />indicated on a request for reimbursement form and liquidated no later than thirty (30) <br />days after the end of that time period. <br />iv) CAPCOG will review all materials provided by the SUBCONTRACTOR with a request <br />for reimbursement, and will not make a reimbursement payment unless all required <br />items listed under Article 3 (b)1(i) of this Attachment have been provided and are <br />deemed to be accurate. <br />v) CAPCOG shall reimburse or otherwise make payment to the SUBCONTRACTOR only <br />for expenses incurred during the term of the Contract between CAPCOG and the <br />SUBCONTRACTOR. <br />vi) CAPCOG will not reimburse or otherwise make payment to the SUBCONTRACTOR <br />for an expenditure that is not authorized under this Contract. If it is determined by <br />either CAPCOG or the TCEQ that an expenditure that was reimbursed is not an <br />authorized expense, CAPCOG shall request return and reimbursement of those funds <br />from the SUBCONTRACTOR or, where appropriate, the application of those funds to <br />other authorized expenses, and shall not provide additional reimbursements to the <br />SUBCONTRACTOR until the funds are returned or are applied to other authorized <br />expenses. <br />2. Documentation required. In general, expenditure documentation to be maintained by the <br />SUBCONTRACTOR should be whatever is necessary to show that the work was indeed <br />performed and that the expense was, in fact, incurred. In addition, the documentation <br />should also support the fact that the expenditure was reasonable and necessary to this <br />Contract. Documents that should be maintained, as appropriate for the expense, include <br />but are not limited to the following: <br />i) SalaryAVages - Time sheets that have been signed and approved. <br />ii) Travel - Documentation which, at a minimum, is consistent with State Travel <br />Regulations. The purpose of the travel should be documented and supported with <br />actual receipts for hotel accommodations, public transportation receipts, airline <br />receipts, etc. <br />iii) Equipment - Purchase orders, invoices, and canceled checks. <br />iv) Supplies - Purchase orders (if issued), invoices, and canceled checks. <br />v) Contractual - All of the above plus documentation that the costs were reasonable and <br />necessary. The same standards should be applicable to subcontractors. <br />3. Additional Documentation. If requested by CAPCOG, the SUBCONTRACTOR agrees to <br />provide to CAPCOG the additional expense records and documentation materials, as listed <br />CAPCOG FY2010 Solid Waste Interlocal Contract 6
The URL can be used to link to this page
Your browser does not support the video tag.