My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2020-150/authorizing Change in Service No. 2 to the Engineering Services agreement with K. Friese and Associates (Contract No. 218-197) relating to the Midtown Drainage Project to provide additional design, topographic survey, geotechnical laboratory
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2020
>
Res 2020-150/authorizing Change in Service No. 2 to the Engineering Services agreement with K. Friese and Associates (Contract No. 218-197) relating to the Midtown Drainage Project to provide additional design, topographic survey, geotechnical laboratory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 1:08:18 PM
Creation date
8/13/2020 9:20:55 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Change in Service
Number
2020-150
Date
8/4/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2020-150R <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br />MARCOS, TEXAS APPROVING CHANGE IN SERVICE NO. 2 TO THE <br />ENGINEERING SERVICES AGREEMENT WITH K. FRIESE AND <br />ASSOCIATES (CONTRACT NO. 218-197) RELATING TO THE <br />MIDTOWN DRAINAGE PROJECT TO PROVIDE ADDITIONAL <br />DESIGN, TOPOGRAPHIC SURVEY, GEOTECHNICAL LABORATORY <br />TESTING AND STRUCTURAL ENGINEERING SERVICES IN THE <br />ESTIMATED AMOUNT OF $63,577.00; AUTHORIZING THE CITY <br />MANAGER OR HIS DESIGNEE TO EXECUTE THE APPROPRIATE <br />DOCUMENTS TO IMPLEMENT THE CHANGE IN SERVICE; AND <br />DECLARING AN EFFECTIVE DATE. <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br />TEXAS: <br />PART 1. A change in service to the engineering services agreement with K. Friese and <br />Associates (Contract No. 218-197) relating to the Midtown Drainage Project to provide additional <br />design, topographic survey, geotechnical laboratory testing and structural engineering services in <br />the estimated amount of $63,577.00 is approved. <br />PART 2. The City Manager or his designee is authorized to execute the appropriate <br />documents to implement the change in service. <br />PART 3. This resolution will be in full force and effect immediately from and after its <br />passage. <br />ADOPTED on August 4, 2020. <br />ne Hughson <br />Mayor <br />Att st: <br />�,. <br />a(mm y, K-Je o o k <br />Interim City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.