My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2020-192/approving the San Marcos Transit Plan, also referred to as the Five-Year Strategic Plan for Transit Service
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2020
>
Res 2020-192/approving the San Marcos Transit Plan, also referred to as the Five-Year Strategic Plan for Transit Service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 4:54:49 PM
Creation date
9/30/2020 1:45:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2020-192
Date
9/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAN MARCOS TRANSIT PLAN I FINALREPORT <br />City of San Marcos <br />Routes 2 Post and 3 Uhland <br />Routes 2 and 3 share the same alignment between downtown San Marcos and Aquarena Springs <br />Road. One vehicle is utilized to operate both routes. The vehicle alternates between Routes 2 and <br />3, creating twobranches, Route 2 to the northeast and Route 3 to the east, each servedhourly. <br />The shared portion of the routes has 30 -minute service. <br />Routes 2 and 3 are realigned from San Marcos Station to the proposed Transit Plaza. Route 2 also <br />has a minor adjustment north ofAquarena Springs Road in the northbound direction to improve <br />operational safety. The Route 3 alignment does not change north of downtown San Marcos. <br />Saturday service is added in Phase 2. Weekdayserviceis extendedto 9:oo p.m. during Phase 3. <br />Routes 2 and 3 Service Summary <br />Nelson\Nygaard Consulting Associates, Inc. 12-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.