Laserfiche WebLink
SAN MARCOS TRANSIT PLAN I FINALREPORT <br />City of San Marcos <br />Bus Stop Improvements <br />New Signage and Poles <br />Implementation of Phase 1 of the serviceplan requires the installation of 20 new stops and the <br />removal of 26 existing stops. 87 existing stopswould not be changed, resultingin a total of 107 <br />stops. Thistotal does not include existing Bobcat Shuttle stops on campus or private property. <br />New signage shouldbe installed at all newand existing stops and includethe following: <br />■ Redesigned San Marcos Transit logo <br />■ Unique panels/stickers for each route with route number and name <br />■ Unique identification number, which canbeusedto access schedule information <br />■ Customer service phone number andwebsite address <br />■ Americanswith Disabilities Act (ADA) -accessibility requirements <br />Purchasing 14o newbus stops signs and 40 poles provides the City with additional materials for <br />future expansion and replacement. <br />Existing San Marcos Transit bus stop signage <br />Nelson\Nygaard Consulting Associates, Inc. 13-2 <br />