Laserfiche WebLink
SAN MARCOS TRANSIT PLAN I FINALREPOR7 <br />City of San Marcos <br />Current Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 <br />Fixed -Route 30 ft Fixed -Route Cutaway IT Senior Shuttle Cutaway ■ Paratransit Cutaway <br />In addition to peak vehicles, spare vehicles are also included in the following fleet plan.A <br />minimum spare ratio of 20% is assumed. <br />Peak and Spare Vehicle Needs <br />20 <br />18 <br />16 <br />14 <br />12 <br />10 <br />8 <br />6 <br />4 <br />2 <br />0 <br />4 <br />Current Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 <br />Peak Vehicles Spare Vehicles <br />Nelson\Nygaard Consulting Associates, Inc. 13-12 <br />