Laserfiche WebLink
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST <br />FOR <br />THE River Bridge Ranch SUBDIVISION • LIFT STATION & FORCE MAIN @ 1200 LUE'S <br />October 14, 2020 <br />Contingency LS 1 15% $ 958,659,18 <br />Engineering LS 1 10% $ 639,106.12 <br />TOTAL LIFT STATION IMPROVMENTS $7,968,826.51 <br />This is an estimate only. Actual "Overslzing Cast" will be calculated after bids are awarded and work is completed <br />based on actual cost per LUE of service, <br />LJA Emoting, Inc does not rrarnrtt or gt=aranlea this'a"aled cot' as an 'actual coo' andtor if an'actusl Construction Coy' Is ragm*, andlor desired than oonsi vdioo Wt OoWd ha <br />abudned from nWepdeto sources. This estimate is boing supptod ler the oppreablo mun"Cipa0y, o7°y and no roprowamrone, wamltas, or guarantors are rendered harahy to any other <br />person or entity sylavrically It,04- ttg, hot not Ilmited to, any mdrigap or landing instiluilon. <br />PREPARED BY: APPROVED BY; <br />UA ENGINEERING, INC. <br />Texas 8aard of ProJessiannr Enptneers Registration 4 F-1386 <br />Resolution Establishing the River Bridge Ranch Public Improvement District Page 12 <br />UNIT <br />TOTAL <br />ITr�M NO. DESCRIPTION <br />UNIT <br />QUANTITY <br />PRICE <br />AMOYNT <br />Uft Station improvements <br />1 <br />Mobilization <br />LS <br />1 <br />11% <br />$ <br />441,957.74 <br />2 <br />Insurance & Bond <br />LS <br />1 <br />3% <br />$ <br />120,533.93 <br />3 <br />Preparing Right -of -Way <br />LS <br />1 <br />4% <br />$ <br />160,711.91 <br />4 <br />6' DR13.5 HDPE Force Main #1 <br />LF <br />22465 <br />$ <br />40.00 <br />$ <br />898,600.00 <br />5 <br />6" DR13,5 HDPE Force Main #2 <br />LF <br />22465 <br />$ <br />40,00 <br />$ <br />898,600,00 <br />6 <br />Air Release Valve <br />EA <br />5 <br />$ <br />2,500,00 <br />$ <br />12,500.00 <br />7 <br />Trench Excavation Safety Protection <br />LF <br />44930 <br />$ <br />1100 <br />$ <br />44,530,00 <br />8 <br />Force Ma1n Tle-In <br />EA <br />1 <br />S <br />2,000.00 <br />$ <br />2,000,00 <br />9 <br />Sanitary Sewer Manhole <br />EA <br />2 <br />S <br />4,500,00 <br />$ <br />9,000,00 <br />10 <br />30'Hx10'D Cast -in -Place Wet Well <br />LS <br />1 <br />S <br />300,000.00 <br />$ <br />300,000,00 <br />11 <br />Submersible Pumps <br />EA <br />3 <br />$ <br />65,000,00 <br />$ <br />195,000,00 <br />12 <br />Site Pavement <br />LS <br />t <br />S <br />30,000.00 <br />$ <br />30,000.00 <br />13 <br />Concrete Driveway <br />LS <br />1 <br />S <br />15,000,00 <br />$ <br />15,000,00 <br />14 <br />Structural Slabs <br />LS <br />1 <br />S <br />75,000,00 <br />$ <br />75,000.00 <br />15 <br />Earthwork <br />LS <br />1 <br />$ <br />30,000.00 <br />$ <br />30,000.00 <br />16 <br />Fencing & Gates <br />LS <br />1 <br />$ <br />20,000,00 <br />$ <br />20,000.00 <br />17 <br />Electrical Service, Control Panels, & SCADA Tower <br />LS <br />1 <br />$ <br />500,000.00 <br />$ <br />500,000.00 <br />18 <br />Yard Piping, Wet Well Piping, Valves, & Fittings <br />LS <br />1 <br />$ <br />70,000,00 <br />$ <br />70,000.00 <br />19 <br />Water Service <br />EA <br />1 <br />$ <br />1,200.00 <br />$ <br />1,200.00 <br />20 <br />Backup Power Generator <br />EA <br />1 <br />$ <br />50,000,00 <br />$ <br />50,000,00 <br />21 <br />Temporary Construction Esm't (30') <br />AC <br />15.5 <br />S <br />7,500.E <br />$ <br />116,250.00 <br />22 <br />Water Easement (20') <br />AC <br />10.3 <br />S <br />15,000.00 <br />$ <br />154,717.63 <br />23 <br />Easement Acquisition <br />LS <br />1 <br />S 500,000.00 <br />$ <br />500,000,00 <br />24 <br />Canopy for Control Panels <br />LS <br />1 <br />$ <br />25,000,00 <br />$ <br />25,000,00 <br />25 <br />Odor Control Appurtenances <br />LS <br />1 <br />$ <br />20,000,00 <br />$ <br />20,000.00 <br />26 <br />Miscellaneous Appurtenances <br />LS <br />1 <br />$ <br />50,000.00 <br />$ <br />50,000,00 <br />27 <br />Driveway Crossings <br />EA <br />11 <br />$ <br />1,000.00 <br />$ <br />111,000.00 <br />28 <br />Bore & Casing 12" force main <br />LF <br />500 <br />$ <br />300.00 <br />$ <br />150,000.00 <br />30 <br />3 -Phase Services <br />LS <br />1 <br />$ 500,000.00 <br />$ <br />500,000.00 <br />Gravity Main Improvements <br />31 <br />8' SDR26 Sewer Main (Trunk Line) <br />LF <br />6411 <br />$ <br />40.00 <br />$ <br />256,440.00 <br />32 <br />12" SDR26 Sewer Main (Trunk Line) <br />LF <br />6102 <br />$ <br />60,00 <br />$ <br />366,120,00 <br />29 <br />Bore & Casing 24" gravity main <br />LF <br />500 <br />$ <br />400.00 <br />$ <br />200,000.00 <br />33 <br />Gravity Manholes <br />EA <br />37 <br />S <br />4f500,00 <br />$ <br />166,500.00 <br />Contingency LS 1 15% $ 958,659,18 <br />Engineering LS 1 10% $ 639,106.12 <br />TOTAL LIFT STATION IMPROVMENTS $7,968,826.51 <br />This is an estimate only. Actual "Overslzing Cast" will be calculated after bids are awarded and work is completed <br />based on actual cost per LUE of service, <br />LJA Emoting, Inc does not rrarnrtt or gt=aranlea this'a"aled cot' as an 'actual coo' andtor if an'actusl Construction Coy' Is ragm*, andlor desired than oonsi vdioo Wt OoWd ha <br />abudned from nWepdeto sources. This estimate is boing supptod ler the oppreablo mun"Cipa0y, o7°y and no roprowamrone, wamltas, or guarantors are rendered harahy to any other <br />person or entity sylavrically It,04- ttg, hot not Ilmited to, any mdrigap or landing instiluilon. <br />PREPARED BY: APPROVED BY; <br />UA ENGINEERING, INC. <br />Texas 8aard of ProJessiannr Enptneers Registration 4 F-1386 <br />Resolution Establishing the River Bridge Ranch Public Improvement District Page 12 <br />