8.FEMA Public Assistance Unmet Need <br />Due to the damages incurred from the flooding of 2015, the City needs approximately $1.7Mto restore <br />and complete projects identified throughout the community that received direct damage from the <br />flooding. The goals of these projects are to allow damaged buildings, parks, and other facilities to return <br />to pre-flood conditions. To date, the City has received funding of approximately $330,000 for these <br />projects. A summary of the total damages (referred to as project cost), funding received (FEMA and <br />others), and unmet needs is outlined in the table below. <br />Summary of Calculable FEMA PA Program Unmet Need <br />FEMA Public Assistance Category Project Cost FEMA PA Unmet Need <br />A -Debris Removal$164,504.00$123,378.00$41,126.00 <br />B - Emergency Protective Measures $419,950.00 $314,962.50.00 $104,987.50 <br />C - Road Systems and Bridges $2,466,785.00 $1,850,088.75.00 $616,696.25 <br />D - Water Control Facilities $572,650.00 $429,487.00 $143,163.00 <br />E - Buildings, Contents, and Equipment $1,819,000.00 $1,364,250.00 $454,750.00 <br />F – Utilities $210,057.00 $157,542.75.00 $52,514.25.00 <br />G - Parks, Recreation and Other Facilities $1,445,400.00 $1,084,050.00 $361,350.00 <br />Total $7,098,346.00 $5,323,759.00 $1,774,587.00 <br />9. Unmet Need for Public Infrastructure/Resilient Critical Infrastructure <br />Activities <br />As noted in the Housing section above, the City is determined to address the conditions that have <br />allowed for repetitive losses due to flooding. Not only have there been these two events within six <br />months of each other, but in the last 20 years there have been multiple flooding events that have <br />caused loss within the City. Residents of the City have increasingly indicated to the City Council and <br />other leaders that they want the infrastructure improved to prevent this ongoing occurrence. <br />Additionally, research indicates that had the infrastructure prior to these events been of a sufficient and <br />appropriate nature, much of the damage to homes and businesses could have been alleviated or <br />mitigated. Therefore, it is the opinion of the City leaders that much of the damage to Housing was <br />exacerbated by a failure of the infrastructure in place, and to stop this from happening in the future, the <br />City must invest its Recovery money in upgrades to its Infrastructure system. <br />The City has evaluated multiple projects with activities under each Category from above that could <br />provide the repair and replacement of public infrastructure resulting in the improvement in the <br />resiliency and sustainability of the City in the face of future floods and other events. The CDBG-DR <br />Infrastructure Study analyzed eight projects located in the areas most damaged by the floods. These <br />project costs for Public Infrastructure improvements are enumerated in the table below. <br />Last Updated 3/03/20 Page 31 of 63 <br /> <br />