Laserfiche WebLink
In addition, City staff has been working on options to reduce the floodwater overflow into the across the <br />City in addition to the overflow channel and upstream detention being analyzed by the Army Corps of <br />Engineers. While this Action Plan is not the location to fully flesh out these projects, and HUD specifically <br />limits the amount of funding that the City can use on Army Corps projects, the City will likely reserve the <br />HUD allowed amount for Planning. Using these funds to amend the City's Hazard Mitigation Plan, <br />whether stand alone or as part of a larger Comprehensive Plan update, will provide the City with a <br />perfect opportunity to fully evaluate the costs and benefits of multiple alternatives, and then choose the <br />projects that best accomplish the goals of this Action Plan. Incorporating these types of activities into <br />this Needs Assessment will add roughly $50 million to the overall need total. It should be noted, <br />however, that many of these activities and projects are inter -related, and therefore will have an <br />overlapping of cost and potentially benefit. Therefore, once all potential projects are vetted as the City <br />enters its implementation phase, this cost may go down as activities are combined or streamlined for <br />efficiency and to remove potential duplications of effort. <br />This Needs Assessment recommends the categories that were addressed by the projects from the <br />Feasibility Study. Based upon the results of the study the City will select projects that meet the National <br />Objective of benefit to low mod citizens of the City through the repair and replacement of public <br />infrastructure and address the greatest priorities. <br />A - Debris Removal $ - <br />B - Emergency Protective Measures $ - <br />C - Road Systems and Bridges $ 6J6," 00 <br />D - Water Control Facilities $ 19,633,300 <br />E - Buildings, Contents, and Equipment $ - <br />F — Utilities <br />$ 1,000,000 <br />G - Parks, Recreation and Other Facilities $ 1,100,000 <br />J0U,';,,,oI c11u, s i o li aIif,J Su„ I of oalry of tJJl l oelIr,,Jc;c;rf,J Io I° Ol 11 astl u, cru„ I„ <br />The Chart below summarizes the City's unmet need related to Infrastructure from both the FEMA Public <br />Assistance Unmet Need and Public Infrastructure projects identified in the CDBG- DR Infrastructure <br />Feasibility Study. Discussions with the public and with City leadership will refine this information and <br />prioritize the assistance needed. At this time, it appears that the priority for utilization of CDBG-DR <br />funding (related to infrastructure) will be for the implementation of Public Infrastructure projects (See <br />Appendix J). <br />Last Updated 3/03/20 Page 32 of 63 <br />