$850,000$0
<br />$5,000,000$500,000$6,971,200$4,528,800
<br />$850,000
<br />$5,000,000$2,500,000$2,500,000$0$4,190,000$4,190,000
<br />$11,500,000
<br />CostDRCity/Other
<br /> $ 9,539,000
<br />$ $ $ $
<br />832,000250,000
<br />$ 4,168,000$ 2,250,000
<br />CDBG-DR Funded Infrastructure Projects
<br />85,000
<br />563,000
<br />1,961,000
<br />$ 765,000$ 3,627,000
<br />$
<br />lead systems for alleys/easements
<br />Infrastructrue project to address Blanco River overflow
<br />Infrastructure project to resolve local flooding in events up to 25-years in Midtown/Aquarena Springs Area including: Intersection improvements east of intersection of IH-35 and Aquarena
<br /> Springs Rd. (curb cuts and inlet improvements) to address significant roadway ponding in a low lying area; TxDOT outfall ditch improvments to address overgrown & unmaintained vegetation
<br /> to increase drainage Davis Road Culverts to increase stormwater conveyance. Infrastructure project to resolve local flooding in events up to 25-years in Blanco Gardens area including:
<br /> addition of a new central storm drain system to Conway & Barbara Drives connected to the existing storm drain system, with a new outfall to the San Marcos River. Includes new storm
<br /> sewer outlets across River Road into the Woods Apartment Ditch and road regrading on River Road from Linda to Cape Rd. to revise the roadway cross-section to a crowned section. Also
<br /> considers inlet and between Barbara & Conway.Infrastructure project to resolve local flooding in events up to 25-years in Clarewood/Barbara Dr. area including: providing a new storm
<br /> drain system to Clarewood Dr. with a connection to both the Bugg Lane system and the existing Highway 80 ditch; regrading Barbara Drive to drain to Bugg Lane for adequate drainage.
<br /> influence on the Blanco Gardens subdivision area along the river bank from Highway 80 to Old Martindale Road. Project includes construction of ~4000 feet of a bank improvements,
<br /> and an associated overflow channel improvements on the Blanco River for mitigation. Project provides significantly increased protection to Blanco Gardens from overflows in river events
<br /> up to 36 years. Infrastructure project to resolve local flooding in events up to 25-years in County/Uhland Rd. area including: reconstructing the roadways to depressed curb-and-gutter
<br /> sections with adequate grading; and adding a new storm sewer system along the whole route with a new outfall to the Blanco River.TOTAL 2017-2022$2,609,000$1,082,000$10,810,000$9,539,000$0$0$24,040,0
<br />00$19,511,200$5,028,800
<br />Uhland Road
<br />ImprovementsImprovements
<br />Blanco Riverine
<br />Blanco Gardens
<br />Midtown/Aquarena Springs Clarewood /Barbara Drive
<br />n/a
<br />623**617**602**36***
<br />Project IDProject NameProject Description201720182019202020212022PROJECT TOTALPROJECT MAP