My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 9:36:32 AM
Creation date
5/11/2021 1:17:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-69
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIRPORT MASTER PLAN <br /> <br />significant utility related concern identified during the inventory process was the <br />availability of reliable telecommunications utilities including fiber to support high- <br />speed internet access and Voice Over IP (VOIP) services. Currently, there is not an <br />accessible fiber line available to tenants along Airport Drive. Tenants that need fiber <br />for their facilities have had to pay for the installation of fiber lines for their facility. <br />The availability of water, wastewater, and telecommunications utilities are a <br />concern related to on airport development along TX-21 as these utilities are not <br />currently available north of the Taxiway Kilo Development Area. However, the City <br />of San Marcos plans to begin design of a 12-inch waterline extension from Airport <br />Drive to William Pettus Rd. in FY 2020 which will serve developments along TX-21. <br />The City of San Marcos also has a planned capital project to extend wastewater and <br />stormwater into the area north of the Kilo Development Area in 2024. This project <br />will extend wastewater and stormwater utilities from the Kilo Development Area up <br />to the MALSR for Runway 13. Design is expected to begin in 2022. <br />Inventory Chapter Page 39 of 52 <br />October 2020 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.