My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-069/approving the San Marcos Regional Airport Master Plan to guide the Airport’s future development and operations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 9:36:32 AM
Creation date
5/11/2021 1:17:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-69
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIRPORT MASTER PLAN <br /> <br />C HAPTER 1: I NTRODUCTION <br />I NTRODUCTION AND P URPOSE <br />An Airport Master Plan (AMP) evaluates <br />principals, planned development, and financial foundation for the future. Because <br />the aviation industry is not static, periodic updates are needed to refresh this <br />information and identify future plans and expectations. The San Marcos Regional <br />Airport (HYI) has had some significant changes since the previous airport master <br />planwas completed in 2001. These changes include changes in area economic <br />conditions, increased based aircraft demand, and changes in fleet mix. <br />This master plan will focus on examining existing facilities, forecasting future <br />aviation demands, identifying the projects necessary to meet that demand, and <br />examining the financial means to achieve the short- and long-term goals for San <br />Marcos Regional Airport. Additionally, the master plan will serve as a tool to aid <br />airport officials in their decision-making regarding San Marcos Regional Airport <br />upkeep and future development. <br />An overview of the AMP process is provided in Figure 1-1. <br /> <br />Introduction Chapter Page 1 of 4 <br />October 2020 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.