Laserfiche WebLink
Mill <br />all <br />50 Ft MAXIMUM <br />I <br />eneral Requirements: <br />• A forecourt must be no more than one-third of the length of <br />the building face, and in no case longer than k 309 feet in <br />length. <br />..:fOre.ggiu.rt....�:C:n.�ust....be:...�p ....less...:tl�i,���ii.....:1._I�..'.....li.�p.....dep.112.:. <br />• The depth of the forecourt should not exceed the general <br />width. <br />• A maximum of one forecourt is permitted per lot. <br />• A forecourt meeting the above requirements is considered <br />part of the building for the purpose of measuring the build -to <br />zone. <br />..k..hle f.tu;ppiutt...p,hi,��pll....lupp,ll.Ludu; �t....11�a i,d',�,p,�tp.liupp...:f� ��t,�u,�9 ug,h....�K.... <br />P.Ilantg,rg, .._all! ..:f,u;gl ul ..... bgj....f og, .jj.[ t.pu•:...p.g; k. rj r.ii....aCt..,vli. ......p.uup_b <br />a..5 ber.iig,h.i.e:p....gr..:ta b,lIgS..).:.. <br />General Requirements: <br />• A gallery must have a clear depth from the support columns <br />to the building's facade of at least 8 feet and a clear height <br />above the sidewalk of at least 9 feet. <br />• A gallery must be contiguous and extend over at least 75% of <br />the width of the building facade. <br />• A gallery may extend into a primary or side street setback. <br />• A gallery may encroach up 9 feet into the public right-of-way but <br />must be at least 2 feet inside the curb line or edge of pavement, <br />whichever is greater. <br />4:38 S<aill malcos Devo�opimail[ Coda Downtown Design F=final Draft: March 2021 <br />