My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-123/ratifying a Developer Participation Agreement with SML Owner I, LLC for the City to participate in the cost of replacing a section of a water main in the vicinity of the Lofts I and II Apartments
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-123/ratifying a Developer Participation Agreement with SML Owner I, LLC for the City to participate in the cost of replacing a section of a water main in the vicinity of the Lofts I and II Apartments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:59:46 PM
Creation date
7/28/2021 3:51:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
2021-123
Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALLIED UNDERGROUND INC. <br />107 N. Grange Street <br />P.O. Box 1732 <br />Bertram, Texas 78605 <br />Phone 612,355.9094 Fax 612.355.2992 <br />Description <br />Onantitv <br />Unit Price <br />Ext, Price <br />Connect to-C-xisting I" Meter Services <br />2 ea <br />$1,750,00 <br />-$3,500.00 <br />8" x 6" Swivel Tee <br />1 ea <br />$675.00 <br />$675.00 <br />8" x 6" Reducer <br />2 ea <br />$280.00 <br />$560.00 <br />6" Gate Valve <br />2 ea <br />$990.00 <br />$1,980,00 <br />6" Sleeve <br />3 ea <br />$300.00 <br />$900-00 <br />8" Megalugs <br />4 ea <br />$9500 <br />$380.00 <br />6" Megalugs <br />11 ea <br />$70.00 <br />$770.00 <br />6" Bell Joint Restraint on Existing Line <br />2 ea <br />$1,750,00 <br />$3.500,00 <br />InsUill 6" Gate Valve on Existing 6" Line <br />1 ea <br />$7,500.00 <br />$7,500.00 <br />Remove 6" pipe and 2" Temp, Line <br />I Is <br />$2,000,00 <br />$2,000.00 <br />Testing <br />11s <br />$1,600.00 <br />$1'500.00 <br />Total Amount for Loft 2 $95,802.00 <br />Total Amount for Loft I & 2 $170,616.00 <br />NOTES: <br />All traffic control, pavement, concrete repairs in new Fredericksburg St, are excluded, Only flowable will be Installed, <br />Fredericksburg St. should be closed for construction, All barricades by others. <br />No flQwable fill will be used. All trenches will be backfilled and compacted with excavated material. <br />No traffic plates. Area will be fenced off by G.C. <br />All water samples will be taken by COSM, <br />-9KQLQ01�* <br />Permit & Inspection fees (except plumbing permit) <br />Capital recovery fees <br />Testing (other than required Pressure tests on piping) <br />Handling, storage or disposal of any contaminated soils. <br />Adjustment or Relocation of any existing utilities, except as bid. <br />Bonds <br />All Traffic Control <br />Engineered Traffic Control Plan and Approval <br />Street Cut & ROW Fees <br />Repair to existing utilities not shown on plans or marked by Texas One Call or Dig Tess, <br />Teonard MeFe—dith Date <br />123138865.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.