Laserfiche WebLink
An application for a watershed protection plan phase 2 may be applied for and approved as an element of a <br />comprehensive site permit or public improvement construction plan when the land is not located p artiall� �FY` ti �FYY�lllll tF I, .in <br />any of the following zones: <br />1. Edwards Aquifer Recharge one; I f2trYrvrt;iorY Zone and 1.�;;Futrr�ir��;ru(.; �"�FrY,¢ �/�rt'Yrr„F t'YO Yrvrtr(F]...Z(FrY(,x,. <br />2. A floodplain, water quality, or buffer zone; <br />3. The San Marcos river protection zone;,&F <br />4. San Marcos river corridor;, o <br />5. Al(t rr`�...�r other ° <br />r�ryct urrwater <br />#2 <br />A I' TL ' , L E/ LI I ; I /1 1 � <br />DIVISION 1: APPROVAL AND APPLICATION PROCESS <br />Section 2.7.1.1 Purpose, Applicability, Exceptions and Effect <br />B. Applicability. Approval of a ��site I' -Permit' rt �,itF'...I'F rrnit� ” � ' ' rrni �)l I } <br />ri of"7"lei vft4 41f fllft CFf" ei ,,"vft4 7 eif`Y ri,"v 1"r:!if"� CF e�� <br />construction ��lF r"Y`Y�r.1a�;..is required prior to any non-exempt development of land within the city limits or within the city's <br />extraterritorial jurisdiction. <br />1 S t e 11,11 e rrriu t. <br />rt <br />All now rYorY residential ritirtf rtrY(k„ <br />nilrl¢� Irl i�Fllr7;ll rYt;,. <br />�),,. Existing non-residential and multi ami y uses that are proposing to add (,;Ff` rl rll vl ol�l rtra rtrl r}, <br />greater than <br />one <br />thousand (1.,15,000) square feet of impervious cover. <br />L:: Existing non-residential and multi family uses that expand more than fifty (50) percent of the building's <br />originally constructed floor area. <br />2. Ske I11,11enrift„ <br />page 2 of 28 <br />