My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-055R/Arts Master Plan approval
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-055R/Arts Master Plan approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 1:15:27 PM
Creation date
3/23/2022 1:15:08 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Performing Arts Centers <br />In Figure B-1, we provide examples of performing arts centers with a scope that might be suitable for <br />San Marcos. Construction costs for a performing arts center vary due to factors including, but not limited to: <br /> Inflation; <br /> Cost of labor; <br /> Quality of design and materials; <br />Number of seats; <br />Number of performance spaces; <br /> Location and square footage of the building; <br /> Land stability concerns (building on a hill vs. flat ground); <br /> Flood mitigation (if built in a potential flood zone); and <br /> Sound proofing needs (if built near a freeway or train tracks). <br />Figure B-1. <br />Recently constructed performing arts centers <br /> <br />Austin ISD Performing Arts Center <br />LocationAustin, TX <br />Number of seats (auditorium) 1,200 <br />Number of seats (black box) 250 <br />Completion date2015 <br />Building cost$36 million <br />Moody Performance Hall <br />LocationDallas, TX <br />Number of seats557 <br />Completion date2012 <br />Building cost$40 million <br />NESA Performing Arts Center <br />LocationSan Antonio, TX <br />Number of seats750 <br />Completion date2021 <br />Building cost$30.5 million <br />Cain Center for the Arts <br />LocationNornelius, NC <br />Number of seats400 <br />Completion dateScheduled for Fall 2022 <br />Building cost$25 million <br />Source: Austin ISD Bond Programs FAQs, Moody Performance Hall website, North East Independent School District <br />website, Cain Center for the Arts website. <br />KEEN INDEPENDENT RESEARCH — SAN MARCOS ARTS MASTER PLAN 2022 APPENDIX B, PAGE 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.