Laserfiche WebLink
Blanco Gardens Neighborhood Projects <br />Blanco Gardens Drainage Improvements <br />Project Details <br />0.15 0.3 <br />Miles <br />Estimated Timeline of Construction: Spring 2022 - Fall 2024 <br />Project Manager Jacquelyn Thomas Contact EngInfo@sanmarcostx.gov 512-393-8130 <br />Reduce flood risk in the Blanco Gardens Neighborhood. Add new storm sewer systems along Conway Street, Barbara Drive and <br />River Road. Install new inlets along River Road that connect to an existing channel parallel to the Red Point Apartments to relieve <br />the existing storm system and tie into existing water quality treatment methods. Install concrete channels within the alleyways <br />parallel to Barbara and Conway to connect to stormwater pipes in River Road; these improvements will carry the stormwater more <br />effectively to a new outfall to the San Marcos River. Replace adjacent outdated Water and Wastewater infrastructure. Regrade and <br />crown a portion of River Road. Repave areas of major underground utility upgrades. New diversion channel along River Road at <br />Animal Shelter Road. <br />