My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-056R/Authorizing a Change in Service to the agreementwith Scheibe consulting cont-218-72 providing additional costruction
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-056R/Authorizing a Change in Service to the agreementwith Scheibe consulting cont-218-72 providing additional costruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 4:35:29 PM
Creation date
4/18/2022 11:56:31 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Change in Service
Number
Contract 218-72
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT 1 <br />CITY OF SAN MARCOS <br />BLANCO GARDENS DRAINAGE IMPROVEMENT PROJECT <br />CHANGE IN SERVICES FOR <br />ADDITIONAL CONSTRUCTION PHASE SERVICES <br />SCOPE OF SERVICES <br />Performing Geotechnical Investigation or Subsurface Utility Engineering "Pot Holing". <br />2. Performing Pavement Design. <br />3. Performing title searches for easement or joint -use agreement preparation. <br />4. Preparation of additional easement/ boundary exhibits beyond the number identified in the Scope <br />of Services. <br />5. Acting as an agent of the City in the acquisition of permanent or temporary easements. <br />6. Preparation of platting documents and/or real property survey for site acquisition. <br />7. Accompanying the City when meeting with the TCEQ, U.S. Environmental Protection Agency, or <br />other regulatory agencies during the course of the Project, beyond those meetings identified above. <br />8. Preparing applications and supporting documents for government grants, loans, or planning <br />advances. <br />9. Appearing before regulatory agencies or courts as an expert witness in any litigation with third <br />parties or condemnation proceedings arising from the development or construction of the Project, <br />including the preparation of engineering data and reports for assistance to the City. <br />10. Providing professional services associated with the discovery of any hazardous waste or materials <br />in the project site. <br />11. Modifications to the design based on cultural resource findings as a direct result of this project or <br />any adjacent project. <br />12. Major modifications to the design based on findings/issues identified in the field by the contractor. <br />13. Additional design modifications post 100% CDs. <br />14. Any increase in construction schedule requiring additional engineering services. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.