Laserfiche WebLink
rA»"'Ai�iiLas <br />CITY OF SAN MA COS <br />p CONSTRUCTION CHANGE ORDER <br />;OJECT: tan Marcos Downtown Accessibpe Pedeslnan 7ra_ffc Signal Imurover r�eM <br />1NTRACT NO.: 221.113 <br />INTRACTOR: Myers- Concrete Construction LP <br />,DRESS: 2301 FM 3237 <br />TY/STATE/ZIP: Wimberley, TX 78676 <br />Date Prepared: 317/2022 <br />Change Order It: 1 <br />We are submitting this Change Order to the referenced contract. In consideration of the Change Order agreed to herein as complete equitable adjustments and full and final payment for <br />Contractor's additional work, the Contractor hereby releases the Owner from any and all liability under this contract for further equitable adjustments, including additional time <br />performance, attributable to such facts or circumstances giving rise to the proposal for adjustment. <br />I ns so onzauon provides for uie tollowing modifications or additions; San Marcos Downtown Accessible Pedestrian Traffic Signal Improvements project was approved for accessible <br />pedestrian improvements at nine intersections. Three Intersections (Guadalupe/Hopkins; Guadalupe/San Antonio; Guadalupolhil.K) are currently under construction and will be completed <br />through TxDOT's SL 82 ADA Improvement Project (STP 2020(967) / 0914-00-446) so it needs to be removed from the orignal contract. <br />1. <br />,Explanation of Items <br />DESCRIPTION <br />PREVIOUS <br />REVISED <br />CHANGE IN <br />UNIT <br />UNIT PRICE <br />ITEM <br />ITEMPREVIOUS <br />DESCRIRTION <br />$0.00 0 $242,05224 -34.211 <br />REVISED <br />CHANGE IN j UNIT PRICE <br />UNIT <br />TOTAL <br />$0.00 0 $242,057.24 -34.2%. <br />I <br />..... _.- <br />QUANTITY <br />QUANTITY <br />QUANTITY <br />116 <br />64 <br />NUMBER <br />SPEC REF. <br />. <br />-$37,206.00 <br />8 <br />- <br />01046055 <br />REMOVING CONC (SIDEWALK) <br />19 <br />0 <br />1 <br />01016032 <br />REMOVING CONC(WHEELCHAIR RAMP) <br />132 <br />89 <br />-43 <br />SY <br />522400 <br />-$9,632.00 <br />2 <br />052860013 <br />' REMOVE AND RELAY PAVERS <br />40, <br />32. <br />-8 <br />,SY <br />$41500 <br />43,320.00 <br />3 <br />05316004 <br />CURB RAfv1PS (7Y 1) ".. <br />28 <br />17 <br />-11"EA <br />"" <br />$3100 a5 <br />-$34,109.351 <br />4 <br />05316010 <br />- <br />CURB RAMPS TY 7) ., <br />4 <br />1" <br />3...... <br />;EA <br />$3103./4'' <br />-$9,549.42" <br />5 <br />05318007 <br />CONCRETE SIDEWALK (4")(REPLACE4IEIJT) <br />48 <br />38 <br />-10 <br />SY <br />$19503; <br />-$1,950.30, <br />6 <br />0529 6000 <br />CONCRETE CURB AND GUTTER{N 11) {RIUD) <br />123 <br />70 <br />-53 <br />LF <br />5103 30 <br />-$5,474.90' <br />TOTAL FOR BID CATEGORY <br />" ` <br />.SUBTOTAL I: <br />•$64.035.971 <br />H. IExplanation of Items <br />ITEM <br />ITEM <br />DESCRIPTION <br />PREVIOUS <br />REVISED <br />CHANGE IN <br />UNIT <br />UNIT PRICE <br />TOTAL <br />„ .NUMBER,. <br />SPEC REF. <br />$0.00 0 $242,05224 -34.211 <br />QUANTITY <br />QUANTITY <br />QUANTITY <br />I <br />$0.00 0 $242,057.24 -34.2%. <br />I <br />_ <br />........ ........................... $242,057.24 90 <br />7 <br />069013070 <br />INS OF TRF SIG PL FND (24" DRIL SH_ FT) <br />116 <br />64 <br />-52 <br />LF <br />5715 50 <br />-$37,206.00 <br />8 <br />- <br />01046055 <br />REMOVING CONC (SIDEWALK) <br />19 <br />0 <br />-19 <br />SY <br />5210 35 <br />-$3,99665 <br />9 <br />06906002 <br />INSTALL OF CONDUIT BY TRENCH114G <br />230 <br />125 <br />-105 <br />LF <br />Sire. 13' <br />-$10,933.G5 <br />10 <br />70556028 <br />PERMANENT ASPHALT PAVEMENT REPAIR <br />29 <br />20 <br />-9 <br />SY <br />526541 <br />42338.69' <br />11 _ <br />0104 6041 <br />_REMOVING OONC (GND BOX W/ APRON) <br />_ 1 <br />0 <br />-1 <br />EA <br />S 1850 73 <br />-$1,850.731 <br />12 <br />6000 6056 <br />INSTALL GROUND BOX(TY D) <br />1 <br />0 <br />-1 <br />EA <br />55,583 11 <br />-$6 583.11 <br />TOTAL CHANGE ORDER <br />- TOTAL i+il; -$125,994.80 <br />CHANGE IN DAYS REQUESTED FOR' HANGS ORDER <br />Data Contract`Document <br />Amount Days ". Running'$dm % Change$,; <br />. — <br />_ ORIGINAL CONTRACT AMOUNT: ..............._............,..................., <br />$368,052.04 90 $368,052.04 DwO% <br />CHANGE ORDER I :........:..........._,....._.... <br />_.............. ......... ._.. $125994,II0 0 $242,057.24 -34.2%i <br />CHANGE ORDER 2; <br />$0.00 0 $242,05224 -34.211 <br />CHANGE ORDFR 3:......._............................................................ <br />$0.00 0 $242,057.24 -34.2 J I <br />CHANGE ORDER XX: <br />$0.00 0 $242,057.24 -34.2%. <br />REVISED CONTRACT AMOUNT/DAYS: <br />_ <br />........ ........................... $242,057.24 90 <br />Your signature below will constitute your acceptance of this Change Order: <br />1. Prepared By Project Manager: <br />2. Contractor: -`-- <br />�l%a eca <br />V-iiy? <br />3/15/22 <br />�Signaluro, <br />nature <br />(Si g ) <br />Dale <br />{Conlrector Title} Date <br />4. Recommended by Department Director: <br />3. Recommend, a by Design Consultant: <br />3/15/22 <br />(Consultant Sign� <br />Dale <br />(Director Signature) Data <br />5. Reviewed by by FiFnance. <br />G. Approved By: <br />Contractor Administrator <br />Date <br />Purchasing Manager _ <br />Data <br />City Manager Date <br />Jr7 7.i/1,;/ T1!!.,!rT11 JN„,IJ,".Jl„''I. .� <br />1;.u;.u�lu,I,.l'., �"1I,�TI,,F .o�rr�P, �rrr.✓,/..� ir �.�Nr. �r�1 ti! <br />.,✓^,!,/,/E/,r/S.N'.J. r�l�.�,iG �a�(/r. �r b �1,/< <br />12/,r, ,��.�,.?"�7,i ,„rl,I. Gr/Iv)�ll 'dfiIr�d� <br />„U,,. /II„ „1,rrlJr✓;/�, 0�l/ <br />��"i�I <br />l /10 <br />J1➢.r,VIl,,. <br />r /;l.19 ,'/l-"x,a!uG�"r'.Y�i r1J:,��';,.. 1ar„(.f�,�,/',r/,,!(�I/Yi%../....,.�.I;.rrY�'.;r..I: <br />�rIF1✓��/f�N',:,,t.,,lf/ n. ./�1 I�r�,Y1N` r/�Jl�rrFr N,fI <br />r�/��1'!fi�"l',fi�,,�,. <br />�(� "11 d,,l�'.r•di,l:%./�V, )p,!�/NF¢/l <br />� <br />Distribution List: Project Manager <br />Finance Department - Contract Administration <br />Contractor <br />Inspector <br />F'e,„a I of t <br />Rr;v 0:1130/ I6 <br />