Laserfiche WebLink
EXHIBIT B <br />AUTHORIZATION OF CHANGE IN SERVICE <br />CONTRACT NUMBER <br />CONTRACT NAME: <br />219-063 Loop 82 & Bobcat Stadium Signal Warrant Study <br />CITY RE, PRESENTATIVE: <br />Rey Garcia, P.E. <br />CONTRACTOR: <br />HDR Engineering, Inc. <br />CONTRACT EFFECTIVE DATE: <br />11/06/18 <br />____F�`THORIZATION <br />THIS AUTHORIZATION DATE: <br />4/13/2022 <br />NO.: 3 <br />DESCRIPTION 0FWORK ?OBBADDED TY}ORDELETED FROM SCOPE 0PSERVICES: <br />This scope of services is toprovide additional services for updating plans atthe request ofthe city for <br />installation of the rectangular rapid flashing beacon (RRFB) at the intersection of Loop 82 and Bobcat Stadium <br />Driveway located inSan Marcos, Texas. The warrant study and design ofRRF8has been completed under the <br />original contract, AOS 1and 2. <br />BASIC SERVICES <br />Our basic engineering services are broken into three (3) stages as described below. Additional services not <br />noted below will be provided under a supplemental work authorization, on an as -needed basis, if required by <br />the City of San Marcos. <br />| Project Management <br />1. Coordinate with City toobtain necessary information, establish project schedule, and provide updates <br />on project progress. All coordination will be by phone, email or video conferencing. <br />2. Prepare and submit monthly invoices. Eight (8) months is assumed. <br />11 Design Plan Update <br />1. Assist City with reviewing submittal items for use by City's purchasing department. <br />2. Attend virtual meeting with City and Contractor on August 3rd 2021. <br />3. Revise design plans and quantities to include pedestal pole in -lieu of using existing signal pole <br />foundation. <br />4. Attend virtual meeting with City and Contractor on April I't, 2022 to discuss pay items and construction <br />process. <br />S. Based on discussions with City, revise plans, quantities, and cost estimate. <br />6. Assist City with revising project manual for traditional bidding. <br />7. Assist City with bidding process. <br />Construction inspection and management of project on a day-to-day basis during construction will be provided <br />02/21/17 Rev. 05/15/18 Page I of 2 <br />