Laserfiche WebLink
EXHIBIT C <br />IMPROVEMENTS NEAR DE ZAVALA DRIVE <br />CONSTRUCTION COST <br />HAYS COUNTY rmdw; <br />FM 621 SAFETY IMPROVEMENTS FOR REVIEW ONLY <br />PRELIMINARY CONSTRUCTION COST ESTIMATE DO NOT USE FOR PERMITTING, BIDDING, OR <br />From 650' west of De Zavala Dr. to CONSTRUCTION. <br />De Zavala Dr. <br />Project Length = 550 LF (0.104 M 1) <br />1011412021 <br />ITEM <br />NO. <br />DESC. <br />CODE <br />DESCRIPTION <br />ENGLISH <br />UNIT <br />PRICE <br />PER <br />UNIT <br />CITY <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />AMOUNT <br />REMOVAL ITEMS <br />100 <br />6002 <br />PREPARING ROW <br />STA <br />$739.26 <br />6 <br />$4,435.66 <br />104 <br />6009 <br />REMOVING CONC, RIPRAP <br />SY <br />$9.99 <br />10 <br />$99.90 <br />104 <br />6029 <br />REMOVING CONC CURB OR CURB & GUTTER <br />LF <br />$6.66 <br />40 <br />$266.40 <br />105 <br />6030 <br />REMOVING STAB BASE & ASPH PAV 8"-14" " . <br />BY <br />$5.87 <br />850 <br />$4,989.50 <br />496 <br />6050 <br />REMOV STR DRIVEWAY CULVERT) <br />EA <br />$0.01 <br />3 <br />$0.03 <br />Removal Subtotal <br />$9,791 <br />ROADWAY ITEMS <br />110 <br />6001 <br />EXCAVATION(ROADWAY) <br />CY <br />$14.55 <br />458 <br />$6,663.90 <br />132 <br />6003 <br />EMBANKMENT FINAL ORD COMP B <br />CY <br />$14.55 <br />221 <br />$3,215.55 <br />247 <br />6366 <br />FL BS CMP IN PLC ,. A GR 5 FNAL POS <br />CY <br />$37.80 <br />.381 <br />$14,386.17 <br />260 <br />6002 <br />LIME HYDRATED LIME SLURR <br />TON <br />$210.00 <br />30 <br />$6,300.00 <br />260 <br />6009 <br />LIME TRT EXSTMATL 10" .++ <br />SY <br />$2.28 <br />1,348 <br />$3,073.44 <br />351 <br />6004 <br />FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") <br />SY <br />$43.38 <br />130 <br />$5,639.40 <br />420 <br />6029 CL C.CONC CAP <br />CY <br />$1.097.12 <br />14 <br />$151359:68 <br />531 <br />6002 <br />CONC SIDEWALKS 5" <br />SY <br />$49.59 <br />653 <br />$32,357.48 <br />531 <br />6008 <br />CURB RAMPS Y5 <br />EA <br />$1,820.13 <br />1 <br />$1,820.13 <br />531 <br />6010 <br />CURB RAMPS 7 <br />EA <br />$1,820.13 <br />3 <br />$5,460.39 <br />540 <br />6001 <br />MTL W-BEAM'GD FEN IM POS <br />LF <br />$28.20 <br />.210 <br />$5,922.00 <br />544 <br />6006 <br />GDRAILEND TRT(INST)(WOODPOST)(TYIII) <br />EA <br />$3,188.00 <br />2 <br />$6,376.00 <br />3076 <br />6001 <br />D -GR HMA TY -13 PG64-22 <br />TON <br />$66,54 <br />319 <br />$21,226.26 <br />3076 <br />6013 <br />D -GR HMA TY -B PG64-22 LEVEL -UP <br />TON <br />$71.79. <br />32 <br />$2,297.2 <br />3076 <br />6048 <br />D -GR HMA TY -D PG76-22 <br />TON <br />$75.99 <br />349 <br />$26,520.51 <br />3085 <br />6001 <br />UNDERSEAL COURSE <br />GAL <br />$3.38 <br />270 <br />$912.60 <br />5007 <br />6036 <br />ADJUST OF WTR VLVE COVRS AND VLVE STCKS <br />EA <br />-$1,200.00 <br />3 <br />$3,600.00 <br />5007 <br />6039 <br />ADJUSTMENT OF WASTEWATER MANHOLES <br />EA <br />$2,000.00 <br />1 <br />$2,000.00 <br />Roadway Subtotal <br />$163,131 <br />[Traffic <br />Control <br />508 <br />6001 <br />CONSTRUCTING DETOURS <br />SY <br />$41.52 <br />173 <br />$7,182.96 <br />512 <br />6009 <br />PORT CTB FUR & INS LOW PRO TY 1 <br />LF <br />$20.00 <br />300 <br />$6,000.00 <br />512 <br />6010 <br />PORT CTB FUR & INS LOW PRO TY 2 <br />LF <br />$20.00 <br />80 <br />$1,600.00 <br />512 <br />6033 <br />PORT CTB MOVE)(LOW PRO TY 1) <br />LF <br />$10.00 <br />260 <br />$2,600.00 <br />512 <br />6034 <br />PORT CTB MOVE LOW PRO 2 <br />LF <br />$12.00 1 <br />80 <br />$960.00 <br />512 <br />6057 <br />PORT CTB REMOV LOW PRO TY 1 <br />LF <br />$8.00 <br />300 <br />$2,400.00 <br />512 <br />6058 <br />PORT CTB (REMOVE)(LOW PROF)(TY 2) <br />LF <br />$8.00 <br />80 <br />$640.00 <br />662 <br />6004 <br />WKZN PAV MRK NON-REMOV 4" SLD <br />0.15 <br />$0.20 <br />3,085 <br />$617.00 <br />662 <br />6034 IWKZN <br />PAV MRK NON-REMOV 4" SLD <br />0.15 <br />$0.20 <br />4,186 <br />$837.20 <br />$22837.16 <br />12 <br />