Laserfiche WebLink
COSM Contractor Reference Check <br />Project Name: <br />Blanco Riverine Flood Mitigation IFB #: 222-206 <br />Consultant Company: <br />Halff Associates, Inc Bid Opening Date: <br />7/14/2022 <br />Staff Performing Reference Check: <br />Andy Dutton PE Date of Reference Check: <br />8/3/2022 <br />The low bidder will need a minimum of 3 reference checks completed. <br />Contractor Company: <br />MA Smith Contracting Co. Inc. Contractor <br />Project Manager: Hardin Camp <br />Referenced Project: <br />Taylor - 2019 Infrastructure Bond - Street Reconstruciton Project <br />Project Description: <br />Street Improvements <br />Person Contacted Name: <br />Clinton Best Telephone # 872-226-6300 <br />Person Contacted Company: <br />HDR Engineering <br />Person Contacted Role: <br />Lead Inspection <br />Scale: 4 = Exceeds expectation, 3 = Met expectations, 2 = Below expectations,11 = No recommendation, n/a = not applicable <br />Work Criteria <br />Comments (Optional) <br />Rating <br />Responsive <br />3 <br />Cooperative (Relationship with City Staff) <br />3 <br />Ability to Meet Schedule <br />3 <br />Work Quality <br />3 <br />Management/Payment of Sub Contractors <br />3 <br />Changes to Project (including change orders) <br />3 <br />Evaluation of Personnel (PM, Superintendent). <br />3 <br />Average <br />1 <br />3.00 <br />Would you recommend this Contractor for future projects? X Yes No <br />General Comments (Optional): <br />