My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-201R/approving award of a contract to MA Smith Contracting Company, Inc. for the Blanco Riverine Flood Mitigation Project in the estimated amount of $14,681,085.70
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-201R/approving award of a contract to MA Smith Contracting Company, Inc. for the Blanco Riverine Flood Mitigation Project in the estimated amount of $14,681,085.70
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2022 2:59:50 PM
Creation date
10/24/2022 2:57:10 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-201
Date
9/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VCOSM <br />Contractor Reference Check <br />Project Name: <br />Blanco Riverine Flood Mitigation IFB #: 222-206 <br />Consultant Company: <br />Halff Associates, Inc Bid Opening Date: <br />7/14/2022 <br />Staff Performing Reference Check: <br />Andy Dutton, PE Date of Reference Check: <br />8/2/2022 <br />The low bidder will need a minimum of 3 reference checks completed. <br />Contractor Company: <br />MA Smith Contracting Co. Inc. Contractor <br />Project Manager: Hardin Camp (Not positive) <br />Referenced Project: <br />New Hope Drive <br />Project Description: <br />Road Reconstruction <br />Person Contacted Name: <br />Derek Bohls Telephone # 512-439-4744 <br />Person Contacted Company: <br />LJA Engineering <br />Person Contacted Role: <br />Engineer of Record - PM for consultant <br />Scale: 4 = Exceeds expectation, 3 = Met expectations, 2 _'Below expectations,'1 = No recommendation, n/a = not applicable <br />Work Criteria + <br />Comments (Optional) <br />Rating <br />Responsive <br />4 <br />Cooperative (Relationship with City Staff) <br />4 <br />Ability to Meet Schedule <br />3 <br />Work Quality <br />3 <br />Management/Payment of Sub Contractors <br />3 <br />Changes to Project (including change orders) <br />3 <br />Evaluation of Personnel (PM, Superintendent). <br />4 <br />Enjoyed working with them <br />Average <br />3.43 <br />Would you recommend this Contractor for future projects? X Yes No <br />General Comments (Optional): <br />
The URL can be used to link to this page
Your browser does not support the video tag.