Laserfiche WebLink
I <br /> I <br /> i <br /> Exhibit 1 — Scope of Services and Deliverables <br /> Task 4—Plan Processing 1 <br /> Kimley-Horn will prepare and submit the plans as a Utility Installation Request Permit Application <br /> to TxDOT. Kimley-Horn will coordinate the services by others as required to support the <br /> application, monitor the status of the applications, respond to "normal" comments, as defined by <br /> the Kimley-Horn and agreed to by the Client, provided by the review staff, and make "normal" <br /> revisions to complete the application in accordance with staff comments in an effort to obtain <br /> approval of the UIR. This task has been provided on an hourly basis due to the unknown level of <br /> effort required at this time and includes up to 24 (24) hours of effort, If additional effort is required, <br /> it will be considered an Additional Service. <br /> a. TxDOT UIR submittal <br /> Kimley-Horn has no control over the actions of Jurisdictional agencies or other parties, Opinions as to <br /> the status of permits and entitlements or their suitability for any specific purpose and as to the <br /> probability and timeframe for approvals are made solely on the basis of available information and <br /> limited research conducted. Kimley-Horn does not guarantee that the outcome of permits and <br /> entitlements or their suitability will not vary from its opinions or that all issues affecting the site have <br /> been investigated. <br /> Task 5--Bid Phase Services <br /> a) Pre-Bid Conference—The Engineer will conduct a Pre-bid conference and prepare meeting <br /> notes and issue an addenda based on questions. <br /> b) Respond to Contractor Questions—the Consultant will respond to contractor questions <br /> regarding clarifications to the plans. j <br /> c) Addenda—The Engineer will answer contractor questions during the bid process. The <br /> i <br /> Engineer will issue addenda as required, but this assumes 2 addenda <br /> d) Final Conformed Contract Documents—Kimley-Horn will provide updated electronic plan <br /> sheets if necessary, for distribution to the Client, <br /> Task Deliverables: <br /> i <br /> Conformed document pdf pian sheets <br /> Task 6--Construction Phase Services <br /> a) Pre-Construction Conference. Consultant will attend a Pre-Construction Conference <br /> before the start of construction. <br /> b) Site Visits and Construction Observation. Consultant will make visits monthly, up to six, <br /> to observe the progress of the work. Observations will not be exhaustive or extend to every <br /> aspect of Contractor's work, but will be limited to spot checking, and similar methods of <br /> general observation. Based on the site visits, Consultant will evaluate whether Contractor's <br /> work is generally proceeding in accordance with the Contract Document and keep Client <br /> informed of the general progress of the work. <br /> i <br /> i <br /> I <br /> Rev 12/2021 <br /> 3 <br />