|
R178493 SKYFLOWER LN 3 $ 9,724.79 $ 774.65
<br /> R178494 SKYFLOWER LN 3 $ 9,724.79 $ 774.65
<br /> R178495 SKYFLOWER LN 3 $ 9,724.79 $ 774.65
<br /> R178496 GOLDFINCH DR Open Space $ - $ -
<br /> R178497 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178498 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178499 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178500 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178501 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178502 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178503 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178504 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178505 CAMINO VERDE Open Space $ - $ -
<br /> R178506 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178507 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178508 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178509 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178510 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178511 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178512 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178513 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178514 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178515 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178516 CAMINO VERDE 3 $ 9,724.79 $ 774.65
<br /> R178517 GRAY WOLF DR 3 $ 9,724.79 $ 774.65
<br /> R178518 GRAY WOLF DR 3 $ 9,724.79 $ 774.65
<br /> R178519 GRAY WOLF DR 3 $ 9,724.79 $ 774.65
<br /> R178520 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178521 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178522 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178523 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178524 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178525 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178526 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R178527 LT.JOHN DECKER DR 3 $ 9,724.79 $ 774.65
<br /> R184026 Right of Way $ - $ -
<br /> R173953 N/A Business Park $ 50,560.76 $ 4,025.96
<br /> R18614 Unplatted Parcel [c] $ 8,524,679.23 $ 678,788.31
<br /> R162349 Unplatted Parcel [c] $ 3,005,701.57 $ 239,332.77
<br /> R18657 Unplatted Parcel [c] $ 105,897.95 $ 8,432.26
<br /> Total $ 18,303,905.08 $ 1,457,582.41
<br /> [a]The Annual Installment covers the period September 1,2022 to August 31,2023,and is due by January 31,
<br /> 2023.
<br /> [b]Prepaid in full.
<br /> [c]The Unplatted Parcel's Annual Installment is allocated to tax Parcels based on acreage.
<br /> [d]The assessment for the Amenity Center was incorrectly assigned to parcel R155718 in the 2021 SAP Update.
<br /> This has been corrected and the Amenity Center assessment has been assigned to parcel R164631 for this 2022
<br /> SAP Update.
<br /> [e]The single family lot count increased from 1,007 lots to 1,024 lots,resulting in a reduced Assessment for all
<br /> Parcels within the District.
<br /> TRACE PID 2022 ANNUAL SERVICE PLAN UPDATE 22
<br />
|