My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-206R/approving a contract with Sullivan Contracting Services through the Choice Partners Purchasing Cooperative Program for emergency roof repair of a hangar
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-206R/approving a contract with Sullivan Contracting Services through the Choice Partners Purchasing Cooperative Program for emergency roof repair of a hangar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 3:24:34 PM
Creation date
11/7/2022 3:16:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-206R
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST PROPOSAL <br /> The undersigned, proposes to complete the Airport Hangar Roof Repair #222-250 for work in <br /> place for the items and quantities identified in the attached cost proposal, which includes the <br /> Contractor's labor, equipment and agreed upon Subcontractors, if any. <br /> The items listed in this Cost Proposal are the items of work that will be measured for payment. <br /> However,the Contractor agrees to perform all other items specified in the technical specifications <br /> or in the other Contract Documents, all work incidental to the specified items, and all work which <br /> may be reasonably inferred from the Contract Documents for the construction of the completed <br /> Project at no additional cost to the Owner, unless additional work is required, which will be <br /> provided for in the form of change order in accordance with the General Conditions. <br /> The Contractor offers to construct the Project in accordance with the Contract Documents for the <br /> contract price, Date set in the Notice to Proceed, to finally complete the Project within 120 <br /> calendar days after the Project Start Date. The Contractor understands and accepts the provisions <br /> of the Contract Documents relating to liquidated damages if the Project is not completed in time. <br /> The Contractor represents to the Owner that it: <br /> 1) fully recognizes the time required for the completion of this Project, and is taking into <br /> consideration all factors including, but not limited to the character of work involved in the <br /> Project, the nature of the Project site, the potential for weather-related impacts on the <br /> construction schedule and market conditions related to materials and equipment to be used in <br /> the Project; <br /> 2) has examined, read and understands the Contract Documents; <br /> 3) is familiar with the Project area and site, and all local, state and federal laws and regulations <br /> that in any manner may affect cost,progress, or performance of the work; <br /> 4) has made and studied the results of examinations, investigations, and tests of subsurface and <br /> latent physical conditions which may affect the cost,progress or performance of the work that <br /> the Contractor considers necessary to assure construction of the Project at the contract price <br /> within the contract time and in accordance with the Contract Documents, and not additional <br /> examinations, investigations, tests, reports or similar information will be required by the <br /> Contractor for these purposes; <br /> 5) has reviewed all information in the Contract Documents with respect to existing underground <br /> facilities at or near the Project site, and the Contractor assumes responsibility for the exact <br /> nature and location of these underground facilities; and not additional examinations, <br /> investigations, tests, reports or similar information will be required by the Contractor in order <br /> to construct the Project at the contract price within the contract time and in accordance with <br /> the Contract Documents, including Section 3.04 of the General Conditions; <br /> 6) has correlated the results of all such observations, examinations, investigations, tests, reports <br /> and studies with the terms and conditions of the Contract Documents; and <br /> 7) has given the Owner written notice of all conflicts,omission,errors or discrepancies discovered <br /> in the Contract Documents and the written response or resolution of the issue by the Owner is <br /> acceptable to the Contractor. <br /> The Contractor certifies that it is familiar with the statutory obligation to provide workers' <br /> Rev 05.15.20 CP-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.