My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-206R/approving a contract with Sullivan Contracting Services through the Choice Partners Purchasing Cooperative Program for emergency roof repair of a hangar
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-206R/approving a contract with Sullivan Contracting Services through the Choice Partners Purchasing Cooperative Program for emergency roof repair of a hangar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 3:24:34 PM
Creation date
11/7/2022 3:16:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-206R
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID:2131EAB58-0322-4827-9016-513641C8BA4F <br /> OWNER-CONTRACTOR AGREEMENT <br /> AIRPORT HANGAR ROOF REPAIR 222-250 <br /> STATE OF TEXAS <br /> COUNTY OF HAYS <br /> This Agreement (this "Agreement") is entered into by and between The City of San <br /> Marcos, a municipality in the State of Texas ("Owner"), and The Pounds Group, LLC dba <br /> Sullivan Contracting Services,2299 Rudeloff Rd.East Seguin,TX 78155,("Contractor"),and <br /> is effective for all purposes as of the date of the last signature to this Agreement("Effective Date"). <br /> Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br /> construction of the Project for the Contract Amount of One Hundred One Thousand Two <br /> Hundred Seventy-Seven and 77/100 ($101,277.77) and within the Contract Time, in accordance <br /> with the Contract Documents. <br /> Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the <br /> Contract in accordance with the amount agreed to herein for all Work in accordance with the <br /> Bidding and Contract Documents, Project Manual, Drawings, and Addenda, which are <br /> incorporated herein by reference and described in Article 2 of the General Conditions which <br /> constitute the Contract between the Owner and the Contractor. Any unit prices contained in the <br /> Bid Form will apply to this Contract in case of subsequent quantity adjustments for work items. <br /> Section 3. The Contractor agrees to commence work, by the project start date set in the <br /> Notice to Proceed, to finally complete and achieve final acceptance of the Project within the <br /> number of days specified in the Project Schedule on PS-1 which is incorporated by reference into <br /> this Owner-Contractor Agreement, subject to extensions of time as provided in the Contract <br /> Documents. Time is of the essence of this Agreement, and the Contractor acknowledges that the <br /> Owner will be damaged if the Contractor fails to complete the Project on time and in accordance <br /> with the Contract Documents. The Contractor agrees to ensure that workers' compensation <br /> insurance coverage will be provided for all persons employed on the Project. <br /> Section 4. The Contractor makes the following representations in order to enter into this <br /> Agreement with the Owner: <br /> a) The Contractor has examined, read, and understands the Contract Documents; <br /> b) The Contractor is familiar with the Project area and site, and all local, state, and federal <br /> laws and regulations that in any manner may affect cost,progress, or performance of the work; <br /> c) The Contractor has made and studied the results of examinations, investigations, and <br /> tests of subsurface and latent physical conditions which may affect the cost, progress, or <br /> performance of the work that the Contractor considers necessary to assure construction of the <br /> Project at the contract price within the contract time and in accordance with the Contract <br /> Documents, and no additional examinations, investigations, tests, reports, or other similar <br /> information will be required by the bidder for these purposes; <br /> Rev 12.01.2021 OC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.