Laserfiche WebLink
Allowable Property Impervious Cover. If any portion of the Property is used for the right-of-way for <br />Centerpoint Road, then the gross area of such portion of the Property and any impervious cover <br />placed on such portion of the Property shall be excluded from all impervious cover calculations with <br />respect to the remainder of the Property. <br />Clustering Incentives in accordance with Section 5.2.8 of the City's LDC may be utilized within the <br />Property subject to the City's approval of a Qualified Watershed Protection Plan Phase 1 and shall <br />be subject to review and approval of all applicable City of San Marcos permits including Watershed <br />Protection Plans, Site Preparation Permits and Environmental and Geologic Assessments and shall <br />be subject to all City of San Marcos and TCEQ regulations for buffering and protection of sensitive <br />features, if any such features are identified on the Property. <br />1.07 Environmental, Water Quality & Detention Standards <br />The development of the Property shall comply with Chapter 5 of the Land Development Code as <br />amended on March 4, 2014 and the associated City of San Marcos Storm Water Technical Manual; <br />provided, however, that development of the portion of the Property described on Exhibits "A-1", "A- <br />2", "A -Y, and "A-4" shall comply with Chapter 6 of the Land Development Code as amended on April <br />17, 2018; provided, further, that development of any portion of the Property described on Exhibits "A- <br />5" and "A-6" shall comply with Chapter 6 of the Land Development Code as amended on September <br />1, 2020; provided, further, that development of any portion of the Property for Film and Television <br />Production Facilities Uses shall comply with Chapter 6 of the Land Development Code as amended <br />on September 1, 2020, as supplemented and modified by those development standards set forth on <br />Exhibit "D" attached hereto. No portion of the Project shall contain concrete storm water detention <br />boxes. Development of the Property will adhere to a standard for removal of a minimum of 85% of <br />the increase in Total Suspended Solids (TSS) after full development of the Property over the baseline <br />existing conditions before development of the Property. The 85% TSS removal may be accomplished <br />utilizing traditional best management practices (BMP's), approved low -impact development (LID) <br />practices, or a combination thereof. All BMP's shall be designed and maintained by the Owner to <br />achieve the performance standard of 85% TSS removal. BMP's for treatment and detention of <br />stormwater proposed for development of this Property may include, but shall not be limited to <br />traditional BMP's such as detention ponds, grass -lined swales, rain gardens, bioswales, biofiltration <br />ponds and native drought -tolerant plants for landscaping or non-traditional, innovative BMP's. The <br />technical design of traditional BMP's shall be in accordance with the City of San Marcos Storm Water <br />Technical Manual. The use of innovative or non-traditional BMP's shall be approved by the City and <br />used within the Property when accompanied by supporting documentation (i.e. product research 1 <br />testing or acceptance from other jurisdictions) illustrating the effectiveness of the BMP's in achieving <br />treatment standards identified herein. The technical design of innovative or non-traditional BMP's <br />shall be in accordance with supplied supporting documentation. Approved vegetative buffers and <br />filters shall not include invasive species. <br />Low Impact Development (LID) techniques allow for greater development potential with less <br />environmental impacts through the use of smarter designs and advanced technologies that achieve <br />a better balance between conservation, growth, ecosystem protection, public health, and quality of <br />life. Where feasible and practical to achieve maximum water quality standards, the development <br />within the Property may incorporate various LID techniques, in one form or another, that work in <br />conjunction with traditional BMP's to achieve 85% TSS removal. <br />Development of the Property may incorporate pervious paving materials such as pervious pavers, <br />pervious concrete (grasscrete or ecocrete) or other pervious paving materials where appropriate. For <br />pervious paving materials used, technical documentation demonstrating the pervious nature of the <br />specific system or systems as installed shall be provided and approved by the City. In the event that <br />City approved pervious paving materials are utilized, the development of the Property shall receive <br />credit towards the Permitted Maximum Allowable Impervious Cover. <br />During the construction process, stabilization and protection measures shall be utilized to limit site <br />disturbance to the construction perimeter (the limits of construction). The type and adequacy of the <br />12 <br />3591485.1 <br />