Laserfiche WebLink
K0. Box 80169 <br /> Austin,TX787O8-0169 <br /> (51Z)832,1979 <br /> TriDObU'lt CnDSfrUrGDO. Inc. <br /> | build is/ ..VV� ,UU"" INSPIRATI0N Change Request <br /> To: City ofSan Marcos Number: C-50 <br /> §3OEHopkins St Date: 8/22/2022 <br /> San Marcos TX 78666 Project: San Marcos Police Station <br /> Job#: 6488E <br /> PM: (512)393'8175 Fax: <br /> Description: SMPD Pre`AcMon3ystem <br /> We are pleased to offer the following specifications and pricing to make the following changes: <br /> Valor Fire Alarm Scope: <br /> I. Provide design overlay ofaddressable fire alarm releasing system <br /> a. Gamawe||/FCIS3 System b. User intuitive system <br /> II. Provide voltage and amperage draw calculations <br /> a. Main Control Panel <br /> III. Install addressable fire alarm releasing system per approved plans drawn by Valor Fire Protection <br /> a. Riser Monitoring o[peaotion system only <br /> b. Smoke Detection(I)in Room 434,441,442.c. Smoke Detection(4)in Room 433-2-dnwnstairs, l-upstairs <br /> d. Pull Stations(4)in rooms 433,434,441,442. <br /> IV. Provide solenoid control torelease sprinkler system <br /> V. Provide relays(3)to Interconnect to Main fire alarm panel (alarm,trouble,supervisory) <br /> VI. Provide interconnection between releasing panel and main fire panel, program and test <br /> YII. Conduct preliminary testing ofsystem <br /> VIII. Conduct one acceptance test with local AM]. <br /> NawejasBactric <br /> • Provide and install conduit,wiring and boxes for(1) 120V dedicated circuit to added Fire Alarm Panel in Room 316. <br /> ° Provide and install back box with (1) 34^conduit toaccessible ceiling for Rooms 435,434,141 &442for visual device. <br /> ° Provide and install back box with (1) 3/4^conduit to accessible ceiling for Rooms 435,434,141 &442 for pull station. <br /> "All work to be performed during normal business hours from 6am to 3:30pm. <br /> Description: Price <br /> Electrical 1,484.00 <br /> Drywall Acoustical Demo Fire Sealant 450.00 <br /> Fire Alarm Systems 37,317.00 <br /> Genera|C|eaning-CoverExidence 1,120.80 <br /> Suparintendent- Eight to nine days 3,200.00 <br /> Po15O <br /> Project .00 <br /> Insurance 660.31 <br /> P&PBond 880.42 <br /> Proflt/ Fee 2,201.05 <br /> === <br /> Total: 47,762.70 <br /> Ifyou have any questions, please contact meat51I-832'1979. <br /> Submitted by: Approved By: <br /> Thmbu||tConstruction,Inc. Date: <br />