My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-263R/approving a contract with The Pounds Group, LLC DBA Sullivan Contracting Services through the Choice Partners Purchasing Cooperative for airport hangars repairs at the San Marcos Regional Airport
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-263R/approving a contract with The Pounds Group, LLC DBA Sullivan Contracting Services through the Choice Partners Purchasing Cooperative for airport hangars repairs at the San Marcos Regional Airport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2023 11:23:59 PM
Creation date
1/9/2023 2:52:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-263R
Date
12/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Quote: 1622082 / Date: 11/30/2022 <br /> Project Number: 1622082 <br /> SULLIVAN <br /> CONTRACTING SERVICES <br /> Customer <br /> Sullivan Contracting Services City of San Marcos <br /> 2299 Rudeloff Rd. East 2217 E. McCarty Ln <br /> Seguin, TX San Marcos, TX <br /> 78155, US 78666, US <br /> (830) 372-3812 <br /> Prepared By: <br /> Kyle Baker <br /> 830-743-7335 <br /> kyle@scs-tx.com <br /> Project: San Marcos Airport- CP <br /> Scope of Work <br /> Choice Partners Contract#21/039MR-14 <br /> Attn: Adam Rossing <br /> Hanger1829: <br /> • Power wash all surfaces to be painted <br /> • Paint hangar with (2) coats of Pro Industrial Multi-Surface Acrylic. <br /> • Clean up of mess generated by construction. <br /> Hanger 1831: <br /> • Provide and install aprox. (40)LF of new base angle <br /> • Provide and install (4) 8"C-Jambs <br /> • Perform (3) column repairs according to detail provided <br /> • Provide and replace R-Panel discussed <br /> • Power-wash all surfaces to be painted <br /> • Paint hangar with (2) coats of Pro Industrial Multi-Surface Acrylic. <br /> • Clean up of mess generated by construction. <br /> Hanger 1833: <br /> • Power wash all surfaces to be painted. <br /> • Paint hangar with (2) coats of Pro Industrial Multi-Surface Acrylic. <br /> • Clean up of mess generated by construction. <br /> • Power wash all surfaces to be painted <br /> • Paint hangar with (2) coats of Pro Industrial Multi-Surface Acrylic. <br /> • Clean up of mess generated by construction <br /> Included(+) <br />
The URL can be used to link to this page
Your browser does not support the video tag.