Laserfiche WebLink
Mr. Drew Wells <br /> August 15, 2022 <br /> Page 13 <br /> An asbestos survey for any existing buildings is not included in this scope of <br /> services. <br /> The project will be bid as a single bid contract but may include bid alternates as <br /> determined by the Client and the Consultant. Preparing documents for separate or <br /> sequential bids and providing out-of sequence services requested by the Owner <br /> are specifically not included in this scope of services. <br /> III. BASIS OF COMPENSATION <br /> The fees for services stated will be as follows: <br /> Item Description — Construction Documents Fee Basis Fee <br /> 1 Preparation for City of San Marcos <br /> Cemetery Expansion Improvements <br /> A Design Survey Allowance Estimated Lump Sum $10,000 <br /> B Geotechnical Evaluation Lump Sum $9,500 <br /> C Schematic Plan Development(30% Lump Sum $16,000 <br /> Construction Document Completion) <br /> D Design Development (60% Construction Lump Sum $15,875 <br /> Document Completion) <br /> E Construction Documents Preparation Lump Sum $33,625 <br /> (100%Construction Document <br /> Completion) <br /> F Regulatory Services Lump Sum $5,000 <br /> G Bidding Services Lump Sum $5,000 <br /> H Construction Phase Services Lump Sum $13,000 <br /> 1 Reimbursable Expenses Estimated Lump Sum $2,000 <br /> Total Design Fee $110,000 <br /> Billing will be monthly as work progresses. <br /> Reimbursable expenses (billed as cost) will be billed in addition to the total <br /> design fee as reimbursable expenses are accrued. <br /> Additional services (all services not shown on Scope of Services) will be billed on <br /> an agreed upon lump sum fee. This proposal does not include services performed <br /> prior to the execution of this agreement or services not specifically addressed in <br /> "The Scope of Services". <br />