My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-002/approving an Advanced Funding Agreement (AFA) with the State of Texas, acting through the Texas Department of Transportation (TxDOT) providing for waterline relocation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-002/approving an Advanced Funding Agreement (AFA) with the State of Texas, acting through the Texas Department of Transportation (TxDOT) providing for waterline relocation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 3:19:00 PM
Creation date
1/17/2023 11:06:51 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-02R
Date
1/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CSJ #0366-01-081 <br />ROW CSJ #0366-01-083 <br />District #14 AFA ID UAFA-14-001 <br />Utility ID # 000014034 <br />Code Chart 64 #37950 <br />Project: SH 123 at De Zavala Drive <br />iii. Secure all necessary permitting as may be required for the installation of the water line. <br />iv. Arrange and coordinate with the contractor, through the State, materials and <br />equipment testing, rejection of all work not conforming to minimum requirements of the <br />construction contract documents, maintenance of the proposed water line during <br />construction, and the relocation of water line and connection of services to customers. <br />v. Advise the State of work that Utility determines should be corrected or rejected. <br />vi. Arrange, observe, and inspect all acceptance testing and notify the State of the results <br />of these activities. <br />vii. Provide inspection services for the construction, notify the State of defects and <br />deficiencies in the work, and observe actions of the contractor to correct such defects <br />and deficiencies. <br />viii. Assume all responsibility for the maintenance of the existing water line during and <br />upon completion of the construction contract. <br />ix. Ensure all Texas Commission on Environmental Quality and all other regulatory rules, <br />regulations and laws are strictly adhered to. <br />X. Prepare and submit both a certificate of substantial completion and a list of observed <br />items requiring completion or correction for the relocations and adjustments to the <br />Project Engineer for concurrence. <br />A. Coordinate all construction activities performed by Utility's staff for the relocations and <br />adjustments through the Project Engineer. <br />B. The State shall provide the following services under this contract: <br />i. Combine the water line relocation and adjustment plans with the plans being prepared <br />for the Project. <br />ii. Review and approve the final construction plans prior to any construction -related <br />activities. In order to ensure federal and/or state funding eligibility, projects must be <br />authorized by the State prior to advertising for construction. <br />iii. Advertise for construction bids, issue bid proposals, receive and tabulate the bids, and <br />award and administer the contract for construction of the Project. <br />iv. Negotiate and administer all field changes and change orders required for the Project. <br />All change orders increasing construction costs for Utility's Project shall be submitted <br />to Utility for review and approval together with an evaluation. Utility agrees to review <br />and either approve or disapprove all change orders within five (5) business days after <br />receipt of such order unless Utility Board's approval is necessary in which case Utility <br />shall bring the item to Utility Board as soon as reasonably possible. <br />V. Provide overall project management to supervise the day-to-day activities of the <br />construction and monitor the activities of the contractor to promote the timely and <br />efficient completion of the Project in accordance with the approved Plans and <br />Specifications and construction schedule. <br />vi. Conduct field observations and coordinate with Utility's inspectors and the contractor to <br />cure defects and deficiencies in the construction prior to final acceptance. <br />vii. Make timely payment to the contractor for work performed in connection with the <br />Project. <br />AFA Utility Page 2 of 3 Attachment A <br />
The URL can be used to link to this page
Your browser does not support the video tag.