My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-013/approving a change in Services to the professional service agreement with BGE Contract 219-129-3
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-013/approving a change in Services to the professional service agreement with BGE Contract 219-129-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:29:58 AM
Creation date
2/9/2023 3:15:30 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />�- <br />EXHIBIT B <br />AUTHORIZATION OF CHANGE IN SERVICE <br />CONTRACT NUMBER / <br />219-129.3 <br />Wallace Addition Offsite Drainage <br />CONTRACT NAME: <br />CURRENT CONTRACT AMOUNT: <br />$ 815,319.00 <br />CITY REPRESENTATIVE/ <br />Rohit Vij <br />DEPARTMENT: <br />$ 1,509,774.00 <br />CONTRACTOR: <br />BGE, INC, Inc. <br />CONTRACT EFFECTIVE DATE: <br />December 3, 2019 <br />COUNCIL RES. NO: <br />2019-243R <br />2020-238R <br />2021-214R <br />THIS AUTHORIZATION DATE: <br />Jarmary17,2023 <br />AUTHORIZATION NO.: <br />3 <br />DESCRIPTION OF WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES: <br />A change in service is requested to complete the drainage design plans, cost estimate and bid documents <br />for the proposed improvements within the Cape's Pond Property (CPP), recently purchased by Hays <br />County, and along Flores Blvd from Cape Road to the State Fish Hatchery property. Improvements <br />within CPP include wetlands, natural channel conveyance segments and overflow weirs. <br />Previous Change In Services <br />CIS#1: Design engineering services for Wallace Addition offsite drainage — November 4, 2020 <br />CIS#2: Addendum to the original preliminary engineering report (PER) — November 3, 2021 <br />Original Contract Amount: <br />$ 165,105.00 <br />Previous Increases/Decreases in Contact Amount: <br />$ 650,214.00 <br />CURRENT CONTRACT AMOUNT: <br />$ 815,319.00 <br />This Increase/Decrease in Contract Amount: <br />$ 694,455.00 <br />REVISED CONTRACT AMOUNT: <br />$ 1,509,774.00 <br />CONTRACTOR: <br />r�- 30 November 2022 <br />Signature Date <br />Abdel Hamed PE Director <br />Print Full Name / Title (if not in individual capacity) <br />CIT <br />OI � <br />Signature ` Date <br />ac2i 6,yv L9�l <br />Print Name / Title <br />City Department Use Only Below This Line (PM, POC, etc.). <br />Account Number(s): <br />Amount Date <br /># <br />$ <br />02/21/17 Rev. 02.01.2021 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.