My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2023-009/Amending Ch 14 Bld and Bldg regulations and chapter 38 Fire Prevention and Protection of City of SM Code of Ordinance to adopt the 2021 International code ICC Family codes and the 2020 National Electric code with amendments
San-Marcos
>
City Clerk
>
02 Ordinances
>
2020's
>
2023
>
Ord 2023-009/Amending Ch 14 Bld and Bldg regulations and chapter 38 Fire Prevention and Protection of City of SM Code of Ordinance to adopt the 2021 International code ICC Family codes and the 2020 National Electric code with amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 8:35:32 AM
Creation date
2/13/2023 3:28:12 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 2702; change and add to read as follows: <br />2702.1.3 Installation. Emergency power systems and standby power systems shall be installed in accordance with <br />the International Building Code, NFPA 70, NFPA 110 and NFPA 111. Existing installations shall be maintained in <br />accordance with the original approval, except as specified in Chapter 11. <br />2702.1.5 Load Duration. Emergency power systems and standby power systems shall be designed to provide the <br />required power for a minimum duration of 2 hours without being refueled or recharged, unless specified otherwise <br />in this code. <br />Exception: Where the system is supplied with natural gas from a utility provider and is approved. <br />2702.1.6 through 1203.1.9 {No changes to these sections.} <br />2702.1.10 Critical Operations Power Systems (COPS). For Critical Operations Power Systems necessary to maintain <br />continuous power supply to facilities or parts of facilities that require continuous operation for the reasons of public <br />safety, emergency management, national security, or business continuity, see NFPA 70. <br />2702.2 Where Required. Emergency and standby power systems shall be provided where required by Sections <br />1203.2.1 through 1203.2.1826 or elsewhere identified in this code or any other referenced code. <br />2702.2.1 through 1203.2.3 {No change.} <br />2702.2.4 Emergency Voice/alarm Communications Systems. Emergency power shall be provided for emergency <br />voice/alarm communications systems in the following occupancies, or as specified elsewhere in this code, as <br />required in Section 907.5.2.2.5. The system shall be capable of powering the required load for a duration of not less <br />than 24 hours, as required in NFPA 72. <br />Covered and Open Malls, Section 907.2.20 and 914.2 <br />Group A Occupancies, Sections 907.2.1 and 907.5.2.2 <br />Special Amusement Areas, Section 907.2.12 and 914.7 <br />High-rise Buildings, Section 907.2.13 and 914.3 <br />Atriums, Section 907.2.14 and 914.4 <br />Deep Underground Buildings, Section 907.2.19 and 914.5 <br />2702.2.15 Means of Egress Illumination. Emergency power shall be provided for means of egress illumination in <br />accordance with Sections 1008.3 and 1104.5.1. (90 minutes) <br />2702.2.16 Membrane Structures. Emergency power shall be provided for exit signs in temporary tents and <br />membrane structures in accordance with Section 3103.12.6. (90 minutes) Standby power shall be provided for <br />auxiliary inflation systems in permanent membrane structures in accordance with Section 2702 of the International <br />Building Code. (4 hours) Auxiliary inflation systems shall be provided in temporary air -supported and air -inflated <br />membrane structures in accordance with section 3103.10.4. <br />2702.2.17 {No change.} <br />2702.2.18 Smoke Control Systems. Standby power shall be provided for smoke control systems in the following <br />occupancies, or as specified elsewhere in this code, as required in Section 909.11: <br />Covered Mall Building, International Building Code, Section 402.7 <br />Atriums, International Building Code, Section 404.7 <br />Underground Buildings, International Building Code, Section 405.8 <br />Group 1-3, International Building Code, Section 408.4.2 <br />(Supp. No. 35, Update 4) <br />Page 19 of 44 <br />Created: 2022-12-02 10:13:41 [EST] <br />
The URL can be used to link to this page
Your browser does not support the video tag.