Laserfiche WebLink
Watershed Protection Plan (WPP) <br />Watershed Protection Plan Phase I (WPP1) <br />$2,000.00 <br />Watershed Protection Phase 11 (WPP2) <br />$1,500.00 plus $100 /acre, Max $5000 <br />Comprehensive Watershed Protection Plan Phase 2 (Includes WPP1 <br />review) <br />$2,000.00 plus $150 /acre, Max $5000 <br />Public Improvement Construction Plan (PICP <br />Public Improvement Construction Plan (PICP) <br />$2,000.00 plus $200 /acre, Max $5000 <br />Comprehensive PICP (includes WPP2 review) <br />$2,500.00 plus $200 /acre, Max $5000 <br />Out of City Utility Extension <br />$1,000.00 <br />Out of City Utility Connection 1$650.00 <br />Im <br />Site Preparation <br />$2,000.00 plus $200 / acre, Max $5000 <br />Comprehensive Site Permit (includes WPP2 review) <br />$2,500.00 plus $200 / acre, Max $5000 <br />Small Site Permit (under 1000 sf impervious cover) <br />$2,000.00 <br />Traffic Impact Analysis (TIA) <br />$1,200.00 <br />TIA (Worksheet) <br />$150.00 <br />Residential (Type 1) Driveway or Sidewalk <br />$100.00 <br />Commercial (Type 11) Driveway or Sidewalk <br />1$200.00 <br />II Floodplain <br />Floodplain permit application (Single Family) <br />$50.00 <br />Floodplain permit application (Commercial) <br />$250.00 <br />Single Family Infill - City Flood Analysis Fee <br />$1,500.00 <br />Floodplain Development Flood Analysis Review Fee <br />$1,200.00 <br />CLOMR (Conditional Letter of Map Revision) or LOMR (Letter of Map <br />Revision) without approved CLOMR <br />$3,700.00 <br />LOMR (with approved CLOMR) <br />$1,700.00 <br />LOMA (Letter of Map Amendment) <br />1$550.00 <br />* All multipliers should be rounded to the nearest whole number <br />