My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-043/approving award of a contract to Cedar Hill Construction for the Briarwood Waterline Improvement Project (including add alt) in the amount of $1,346,381.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-043/approving award of a contract to Cedar Hill Construction for the Briarwood Waterline Improvement Project (including add alt) in the amount of $1,346,381.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:35:45 AM
Creation date
3/7/2023 11:02:08 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-043
Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 4, 2023 <br />Via Electronic Mail <br />Rey Garcia, P.E. <br />Senior Engineer — Capital Improvements/Engineering <br />630 E. Hopkins <br />San Marcos, TX 78666 <br />RE: Recommendation Letter <br />IFB 223-005 Briarwood Waterline Improvements Project <br />Dear Mr. Garcia: <br />A total of two (2) bids were received for the Briarwood Waterline Improvements project on December <br />S, 2022. A copy of the bid tabulation and bid item breakdown is enclosed in Attachment A. <br />The apparent low bidder for the above referenced project is Cedar Hills Construction LLC with a base bid <br />amount of $1,218,204.80, an additive alternate 1 bid arnount of $82,606.80, and an additive alternate 2 bid <br />amount of $128,176.20. <br />Ranking <br />Bidder <br />Base Bid Total <br />Additive <br />Additive <br />Alternate 1 Total <br />Alternate 2 Total <br />1 <br />Cedar Hills Construction LLC <br />$1,218,204.80 <br />$82,606.80 <br />$128,176.20 <br />2 <br />Aaron Concrete Contractors, LP <br />$1,406,829.60 <br />$72,918.00 <br />$120,390.00 <br />Cedar Hills Construction has provided all required documentation in the bad package with the exception of <br />three (3) projects within the last five (5) years. The contractor only provided past projects dating back to <br />2021 since that is around the time this contractor branched off from another experienced contractor as a <br />separate standalone company. Although Cedar Hills Construction is a newer company, the owner appears <br />to have the knowledge and experience for work related to water main and water service installation from <br />past projects as a lead project manager. Their references provided positive feedback, and all stated they <br />would recommend Cedar Hills Construction for future projects. <br />Based on their Statement of Qualifications and the references checked, Cedar Hills Construction LLC <br />appears to be qualified and capable of performing the work for this project. Based on this information, and <br />Purchasing Manager's assessment of responsiveness of the Bidder, BGE recommends that the City of San <br />Marcos award the construction contract for this project to Cedar Hills Construction LLC for a total bid <br />amount of $1,218,204.80. <br />
The URL can be used to link to this page
Your browser does not support the video tag.